What happened in Reservoir section:
Getting OBM sent out lith a low O/W ratio (70/30).

What Was Planned

Mix OBM onshore and send out to rig

What Was Learned

It is difficucult logistically and time consuming to mix the mud on the rig.

What Actions Are Required

All mixing should be done onshore. Have the mud sent out with an O/W ratio in the higher end of the spec (80/20).