WE Report

Lessons Learned

Lessons Learned865


Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

Faroe
271 – Faroe

Transocean Arctic Drilling Operational 30/6-30
Rungne
Intermediate section 27/09/2019 Observed stick-slip while drilling through sand intervals and after a limestone stringer.


PDF


Edit


Faroe
272 – Faroe

Transocean Arctic Drilling Operational 30/6-30
Rungne
Intermediate section 27/09/2019 Axebalde bit with v-shaped cutters drilled through most limestone stringers without any reduction in . . .


PDF


Edit


Wellesley
206 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Production section 07/02/2019 Unable to release CRTi tool after using it for the first time (above). Spent 30 min. And called . . .


PDF


Edit


Wellesley
207 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Production section 07/02/2019 AxeBlade Bit performed well, did not create stick-slip.


PDF


Edit


Wellesley
208 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Production section 07/02/2019 The Halliburton BSS “skip & ship” system worked very well. There was no problem handling60 m/hr . . .


PDF


Edit


Wellesley
209 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Production section 07/02/2019


PDF


Edit


Wellesley
210 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Production section 07/02/2019 Problems experienced with poor quality of pre-doped connections. Remains of rusty water and storage . . .


PDF


Edit


Wellesley
211 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Production section 07/02/2019 The pump strokes and volume pumped (from pit sensors) matched very well from 0-83 m3 mud pumped . . .


PDF


Edit


Wellesley
212 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Production section 07/02/2019 All 3 wiper plug shears & burst were clearly seen during this cement job; bottom plug shear, top . . .


PDF


Edit


Wellesley
213 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Production section 07/02/2019 Trip sheet from Geoservice and Transocean has shown different numbers. In addition, gains have been . . .


PDF


Edit


Wellesley
214 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Reservoir section 07/02/2019 Investigated two sensor systems in TT.


PDF


Edit


Wellesley
215 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Reservoir section 07/02/2019


PDF


Edit


Wellesley
216 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Reservoir section 07/02/2019 After POOH with 8 1/2″ BHA (prior to coring), decided to not run same due to wear on teeth coating. . . .


PDF


Edit


Wellesley
217 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Reservoir section 07/02/2019 Junk was found in core barrel (piece of coiled copper plated spring steel). Possibly a piece of . . .


PDF


Edit


Wellesley
218 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Reservoir section 07/02/2019 While RIH with 8 1/2″ BHA, noticed 2 cm missing from one of slip segments. Checked rest of dog . . .


PDF


Edit


Wellesley
219 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Reservoir section 07/02/2019 Galled monel connection on LWD string when POOH from initial TD 3102 m (between sonic and crossover . . .


PDF


Edit


Wellesley
220 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Reservoir section 07/02/2019 Not enough weight on jar when drilling with 8 1/2″ rock bit in order to drill with jar in tension. . . .


PDF


Edit


Wellesley
221 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
P&A 07/02/2019 Not enough cuttings skips for P&A cement plugs.


PDF


Edit


Wellesley
222 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
P&A 07/02/2019 Halliburton planned for 15 m3 spacer for an 11 m3 slurry volume.


PDF


Edit


Wellesley
223 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
P&A 07/02/2019


PDF


Edit


New Lesson Learned

You do not have permission to view this form.