Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
8483 – DNO

Deepsea Yantai HSEQ Operational 35/10-13
Kjøttkake
P&A 24/03/2025 When cementer was dropping/pushing CST into DP filled with OBM “splashed” out of pipe and spilled on . . .

Sander Schaathun / Stig Seland


PDF


Edit


DNO
6878 – DNO

Nobel Invincible HSEQ
NEA Q&A
Planning 2/6-7 S
Falstaff
Other 11/10/2024

Spørsmål angående søknad om tidsaavik på responstid:
1. Mulighet for å minske responstid for . . .

Helene Folkvord / Anniken Meisler



PDF


Edit


DNO
6876 – DNO

Nobel Invincible HSEQ
NEA Q&A
Planning 2/6-7 S
Falstaff
N/A 02/05/2024

Fiskeridirektoratet fraråder at det blir gitt tillatelse til prøveboring. Som begrunnelse vises det . . .

Anniken Meisler / Anniken Meisler



PDF


Edit


DNO
6875 – DNO

Nobel Invincible HSEQ
NEA Q&A
Planning 2/6-7 S
Falstaff
N/A 09/04/2024

Planlagt hamring for lederør med lydutsending som starter på et lavt nivå og øker gradvis til . . .

Anniken Meisler / Anniken Meisler



PDF


Edit


DNO
1437 – DNO

Borgland Dolphin HSEQ
PSA Q&A
Planning 2/5-15
Gomez
N/A 16/04/2021

Hvordan samordner operatør og boreentreprenør behov for å gjennomføre fortløpende . . .

Karina Helle / Morten Laget


PDF


Edit


DNO
1438 – DNO

Borgland Dolphin HSEQ
PSA Q&A
Planning 2/5-15
Gomez
N/A 16/04/2021

Hvilke tiltak har operatør iverksatt for å sikre at operatørs og annet 3. parts utstyr tatt ombord . . .

Karina Helle / Morten Laget


PDF


Edit


DNO
1439 – DNO

Borgland Dolphin HSEQ
PSA Q&A
Planning 2/5-15
Gomez
N/A 16/04/2021

Hvilke rutiner er etablert for å formidle resultater fra arbeidsmiljøkartlegginger eller . . .

Karina Helle / Morten Laget


PDF


Edit


DNO
1445 – DNO

Borgland Dolphin HSEQ
PSA Q&A
Planning 2/5-15
Gomez
N/A 16/04/2021

Utdrag av rapport /66/ DNO, 2021. P968-DNO-D-RA-0004 Rig intake report mhp. beredskapsrelaterte . . .

Karina Helle / Morten Laget


PDF


Edit


DNO
1345 – DNO

Borgland Dolphin HSEQ
PSA Q&A
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 11/02/2021

Vernetjenesten i Dolphin Drilling har en kommentar i deres uttalelse til samtykket. Vi ber om . . .

Karina Helle / Morten Laget


PDF


Edit


DNO
1177 – DNO

Borgland Dolphin HSEQ Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 10/02/2021 Reactivation and emergency preparedness has been challenging

Karina Helle / Morten Laget



PDF


Edit


DNO
1238 – DNO

Borgland Dolphin HSEQ
NEA Q&A
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 09/02/2021

I kap 3.1 skriver dere at Etter fase 2 vil oljebasert borevæske (OBB) bli benyttet og brukt OBB vil . . .

Karina Helle / Morten Laget



PDF


Edit


DNO
1239 – DNO

Borgland Dolphin HSEQ
PSA Q&A
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 31/01/2021

«Hvordan har DNO påsett at reder har sikret at beredskapsrelatert utstyrt er blitt preservert, . . .

Karina Helle / Morten Laget



PDF


Edit


DNO
1161 – DNO

Borgland Dolphin HSEQ
Experience Transfer Meeting
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 08/09/2020 Low reactive safety figures.

Actions Required for Oselvar: Look into a system for follow up of safety performance
Karina Helle / Morten Laget



PDF


Edit


DNO
1118 – DNO

Island Innovator HSEQ
PSA Q&A
Planning 6507/7-16 S
Canela
N/A 23/07/2019

Kopi av Canela Project and Interface Management Manual (PIMM) rev 01 29.04.2019
o GAP-analyse . . .

Karina Helle / Morten Laget


PDF


Edit


DNO
1119 – DNO

Island Innovator HSEQ
PSA Q&A
Planning 6507/7-16 S
Canela
N/A 23/07/2019

Kran og løft samt fallende gjenstander er identifisert som risiko områder ref. 11.5 i søknaden . . .

Karina Helle / Morten Laget


PDF


Edit


DNO
1120 – DNO

Island Innovator HSEQ
PSA Q&A
Planning 6507/7-16 S
Canela
N/A 23/07/2019

o Foreligger det rapport revisjoner som innbefatter kran og løft dersom det er foretatt ønskes kopi . . .

Karina Helle / Morten Laget


PDF


Edit


DNO
297 – DNO

Island Innovator HSEQ Planning 6507/7-16 S
Canela
N/A 07/01/2019 No description of the specific procedures for the project


PDF


Edit


DNO
300 – DNO

Island Innovator HSEQ Planning 6507/7-16 S
Canela
N/A 07/01/2019 Confusion regarding alert to the PSA on a medevac caused by sentence in Emergency Prepardness . . .


PDF


Edit


DNO
322 – DNO

Island Innovator HSEQ Operational 6507/7-16 S
Canela
N/A 07/01/2019 Unplanned contamination of DW tanks with SW.


PDF


Edit


DNO
1232 – DNO

Borgland Dolphin HSEQ
PSA Findings
Other A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 11/11/2016

Karina Helle / Morten Laget


PDF


Edit