Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
6878 – DNO

Nobel Invincible HSEQ
NEA Q&A
Planning 2/6-7 S
Falstaff
Other 11/10/2024

Spørsmål angående søknad om tidsaavik på responstid:
1. Mulighet for å minske responstid for . . .

Helene Folkvord / Anniken Meisler



PDF


Edit


DNO
1437 – DNO

Borgland Dolphin HSEQ
PSA Q&A
Planning 2/5-15
Gomez
N/A 16/04/2021

Hvordan samordner operatør og boreentreprenør behov for å gjennomføre fortløpende . . .

Karina Helle / Morten Laget


PDF


Edit


DNO
1438 – DNO

Borgland Dolphin HSEQ
PSA Q&A
Planning 2/5-15
Gomez
N/A 16/04/2021

Hvilke tiltak har operatør iverksatt for å sikre at operatørs og annet 3. parts utstyr tatt ombord . . .

Karina Helle / Morten Laget


PDF


Edit


DNO
1439 – DNO

Borgland Dolphin HSEQ
PSA Q&A
Planning 2/5-15
Gomez
N/A 16/04/2021

Hvilke rutiner er etablert for å formidle resultater fra arbeidsmiljøkartlegginger eller . . .

Karina Helle / Morten Laget


PDF


Edit


DNO
1445 – DNO

Borgland Dolphin HSEQ
PSA Q&A
Planning 2/5-15
Gomez
N/A 16/04/2021

Utdrag av rapport /66/ DNO, 2021. P968-DNO-D-RA-0004 Rig intake report mhp. beredskapsrelaterte . . .

Karina Helle / Morten Laget


PDF


Edit


DNO
1398 – DNO

Borgland Dolphin External Environment Planning A-1 H, A-2 H, A-3 HT2
Oselvar
06/04/2021 The OSCP should be sent to rig and PSVs 2 days prior to arrival on location, not before setting BOP . . .

Christina Sæland Rødne / Anniken Meisler


PDF


Edit


DNO
297 – DNO

Island Innovator HSEQ Planning 6507/7-16 S
Canela
N/A 07/01/2019 No description of the specific procedures for the project


PDF


Edit


DNO
300 – DNO

Island Innovator HSEQ Planning 6507/7-16 S
Canela
N/A 07/01/2019 Confusion regarding alert to the PSA on a medevac caused by sentence in Emergency Prepardness . . .


PDF


Edit


DNO
1223 – DNO

Borgland Dolphin HSEQ
Experience Transfer Meeting
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
Production section 06/05/2012 DONG handover documentation: Due to LWD tool failures on previous reservoir sections it was decided . . .

Include mud cooler in future reservoir sections with high temperature.
Karina Helle / Morten Laget


PDF


Edit


New Lesson Learned