Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
1245 – DNO

Borgland Dolphin Drilling
PSA Q&A
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 31/01/2021

o Hvordan verifiseres sement bak casing for “open hole to surface plug”?

Karina Helle / Morten Laget



PDF


Edit


DNO
1246 – DNO

Borgland Dolphin Drilling
PSA Q&A
Other A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 31/01/2021

Fra møte i september ber vi om en oppfølging av følgende aksjoner:

Actions
Based on feedback and . . .

Karina Helle / Morten Laget


PDF


Edit


DNO
1247 – DNO

Borgland Dolphin Drilling
PSA Q&A
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 31/01/2021

Recommend establishing plans for handling possible trapped gas in Oselvar wells when opening the . . .

Karina Helle / Morten Laget


PDF


Edit


DNO
1248 – DNO

Borgland Dolphin Drilling
PSA Q&A
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 31/01/2021

Review historical documentation regarding “Baseline Survey” performed by DONG (previous operator) . . .

Karina Helle / Morten Laget


PDF


Edit


DNO
986 – DNO

Borgland Dolphin Other Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 05/11/2020 Went through the detailed operational steps early in the planning phase (DG2) with relevant . . .

Øystein Prytz


PDF


Edit


DNO
972 – DNO

No Rig Drilling
INTERNAL
Planning No well
Gomez
N/A 17/10/2020 No kickoff or handover to the Well Management team.

Morten Laget


PDF


Edit


DNO
1153 – DNO

Borgland Dolphin Multidicipline
Experience Transfer Meeting
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 08/09/2020
Too little time for planning.
Not enough time for examination of the SSBoD.
Risks and mitigating . . .

Actions Required for Oselvar: Secure enough time for planning and optimalization – > 6 . . .
Karina Helle / Morten Laget



PDF


Edit


DNO
1155 – DNO

Borgland Dolphin Drilling
Experience Transfer Meeting
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 08/09/2020
Initial engineering not completed before select phase started.
Several several MoCs.

Actions for Oselvar: “Secure alignement in the project.
Use the project meetings to aligne
Set . . .
Karina Helle / Morten Laget



PDF


Edit


DNO
1157 – DNO

Borgland Dolphin Drilling
Experience Transfer Meeting
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 08/09/2020 Onshore spares/stocks were limited landing string sourced 3rd party.

Actions Required for Oselvar: Minimum 6 moths planning time
Identify LLI early
Secure small volume . . .
Karina Helle / Morten Laget



PDF


Edit


DNO
1158 – DNO

Borgland Dolphin C&P
Experience Transfer Meeting
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 08/09/2020 A lot of POs and Invoices.

Actions Required for Oselvar: Ensure contract strategy is known within the team
Karina Helle / Morten Laget



PDF


Edit


DNO
1159 – DNO

Borgland Dolphin Drilling
Experience Transfer Meeting
Reporting A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 08/09/2020
Reduced operational efficiency due to poor weather.
Developed a method to lay out completion . . .

Actions Required for Oselvar: Plan for lay out of completion tubulars
Secure efficient operations . . .
Karina Helle / Morten Laget



PDF


Edit


DNO
1160 – DNO

Borgland Dolphin Multidicipline
Experience Transfer Meeting
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 08/09/2020
Site visit and good communication.
Good rig-to-platform interface.
High level of support during . . .

Actions Required for Oselvar: Plan for site visits
Interface management
Proper facilitation of . . .
Karina Helle / Morten Laget



PDF


Edit


DNO
1161 – DNO

Borgland Dolphin HSEQ
Experience Transfer Meeting
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 08/09/2020 Low reactive safety figures.

Actions Required for Oselvar: Look into a system for follow up of safety performance
Karina Helle / Morten Laget



PDF


Edit


DNO
1162 – DNO

Borgland Dolphin Multidicipline
Experience Transfer Meeting
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 08/09/2020
Efficient switch to suspension mode.
Flexibility due to Covid-19.

Actions Required for Oselvar: Prepare for contingencies
Karina Helle / Morten Laget



PDF


Edit


DNO
1163 – DNO

Borgland Dolphin Logistics
Experience Transfer Meeting
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 08/09/2020
Experience transfer meeting, Schooner & Ketch: Efficient mibilisation and backload
Minimal best . . .

Karina Helle / Morten Laget



PDF


Edit


DNO
1164 – DNO

Borgland Dolphin Multidicipline
Experience Transfer Meeting
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 08/09/2020

Actions Required for Oselvar: “- Internal requirements for P&A operations
– DNO’s ability to . . .
Karina Helle / Morten Laget



PDF


Edit


DNO
1315 – DNO

Island Innovator Planning 6507/7-16 S
Canela
22/01/2020 Norsea Fakturere “Lump sum” ISPS og kai pr anløp


PDF


Edit


DNO
1314 – DNO

Island Innovator Planning 6507/7-16 S
Canela
16/01/2020 Viktighet av å gå opp ansvarsforhold og rapporteringslinjer


PDF


Edit


DNO
1312 – DNO

Island Innovator Planning 6507/7-16 S
Canela
15/01/2020 Utfordrende oppstart med IDC i Bremsnesfjorden


PDF


Edit


DNO
1313 – DNO

Island Innovator End of Well 6507/7-16 S
Canela
15/01/2020 Standard report – EOW


PDF


Edit


New Lesson Learned

You do not have permission to view this form.




\n\t\t

\n\t\t\t\n\t\t\t