Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

Wellesley
5133 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Surface section 10/04/2023 MWD/DD instructed drilling crew to break wrong connection when L/D 26″ BHA. As top part of assy was . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5134 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Surface section 10/04/2023 It was difficult to stab in the 20″ casing joints with 15 ft bails and rig movement

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5135 – Wellesley

Deepsea Yantai Drilling Planning 35/10-10S
Carmen
Surface section 10/04/2023 Difficult to install

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5136 – Wellesley

Deepsea Yantai Drilling Planning 35/10-10S
Carmen
Surface section 10/04/2023 Overpull experienced trying to pull the WHRT clear of the Housing after release.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5137 – Wellesley

Deepsea Yantai Drilling Planning 35/10-10S
Carmen
Surface section 10/04/2023

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5121 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Surface section 09/04/2023 Did not observe a shoulder making the casing up to 27 500 ft-lbs.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5122 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Surface section 09/04/2023 The shoetrack was made up to 27,500 ft.lbs.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5123 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Surface section 09/04/2023 The centralizers was placed close to the bottom of the casing joint and was difficult to handle on . . .

Drilling Engineer / Morten Laget


PDF


Edit


INEOS
4952 – INEOS

No Rig Logistics
NEA Q&A
Planning No well Surface section 07/11/2022

test- Kan du slette denne Daniel?

Karina Helle / Tommy Johnsen


PDF


Edit


PGNiG
4911 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
Surface section 20/09/2022
10-15 ton OP while pulling out of open hole.
Bit and stabs balled up / clay

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4904 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
Surface section 15/09/2022 The cement swivel was delivered with the wrong threads. Delivered with NC50, should been XT57.

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4949 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
Surface section 15/09/2022
After landing the 18 3/4″ LPWHH, the RT would not release from the WH. Several times they attempted . . .

Richard Mollison


PDF


Edit


PGNiG
4950 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
Surface section 15/09/2022 The box end of the 13 3/8″ no cross coupling is too long to allow the use of the casing running tool . . .

Richard Mollison


PDF


Edit


PGNiG
4835 – PGNiG

Deepsea Yantai Drilling
Own Experience
Operational 6608/1-1 S
Copernicus
Surface section 04/09/2022
When the rig reached a TD of 1100 m and no contingency 4-string design was needed anymore, the 20″ . . .

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4765 – PGNiG

Deepsea Yantai Drilling
Own Experience
Planning Copernicus Surface section 23/08/2022 The use of normal HWDP Requires double handling from fingerboard to well center when running and . . .

Richard Mollison / Morten Laget


PDF


Edit


Wellesley
2413 – Wellesley

Borgland Dolphin Drilling
Own Experience
Operational 36/1-4
Hemispheres
Surface section 04/01/2022
Ahead of a connection at 1146m (105m below the 13 3/8″ shoe), a blockage occurred in the cuttings . . .

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2106 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Surface section 31/08/2021
Drilled 12 ¼” hole with Smith XZ616 AxeBlade PDC bit from 1613 m to 2895 m in a vertical hole. . . .

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2098 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Surface section 27/08/2021 Unable to set seal assembly after 13 3/8″ hanger was landed. Attempted several times to pressure up . . .

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2096 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Surface section 22/08/2021 DrilQuip MPT and BOP test tool was sent out without pup joints.

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2014 – DNO

Borgland Dolphin Drilling
Experience Transfer Meeting
Operational 2/5-15
Gomez
Surface section 14/08/2021 The Franks split bushing spider (SBS) did not fit inside the EMSCO rotary table on Borgland Dolphin.

Get in contact with Franks coordinator in town?
Drilling Supervisor / Morten Laget


PDF


Edit