WE Report

Lessons Learned

Lessons Learned865


Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
327 – DNO

Island Innovator Drilling Operational 6507/7-16 S
Canela
Reservoir section 07/01/2019 ESD accidentally operated in wireline unit.


PDF


Edit


DNO
328 – DNO

Island Innovator Drilling Operational 6507/7-16 S
Canela
P&A 07/01/2019 During POOH with 9 5/8″ cutting assembly the pipe lifted out of slips due to knives hanging up in WB . . .


PDF


Edit


Faroe
157 – Faroe

Deepsea Bergen Drilling Operational 31/7-2 S
Brasse Appraisal
P&A 28/09/2017 Drilled 36″ hole with 36″ bit at 21 m/hr on bottom ROP without problems maintaining verticality.


PDF


Edit


Faroe
158 – Faroe

Deepsea Bergen Drilling Operational 31/7-2 S
Brasse Appraisal
Top hole 28/09/2017 Problems to close the 30″ side door elevator due to shackles. Removed shackles and connected the 500 . . .


PDF


Edit


Faroe
161 – Faroe

Deepsea Bergen Drilling Operational 31/7-2 S
Brasse Appraisal
Intermediate section 28/09/2017 Remote on Cement head did not work. Had to operate manually by man in riding belt. The tool worked . . .


PDF


Edit


Faroe
166 – Faroe

Deepsea Bergen Well test Operational 31/7-2 S
Brasse Appraisal
N/A 28/09/2017 Running cable through cut out in master bushing


PDF


Edit


Faroe
168 – Faroe

Deepsea Bergen Well test Operational 31/7-2 S
Brasse Appraisal
N/A 28/09/2017 Changing out subsea test tree, from 10 to 15 k


PDF


Edit


Faroe
175 – Faroe

Deepsea Bergen Drilling Operational 31/7-2 S
Brasse Appraisal
P&A 28/09/2017 8 hrs were used cutting the extension joints. During the cutting a high stick-slip was observed by . . .


PDF


Edit