Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

INEOS
2300 – INEOS

Borgland Dolphin Drilling
Own Experience
Planning 6306/3-1 S
Fat Canyon
Intermediate section 09/11/2021
Initial planned centralizer program of using 1 centralizer every other joint above shoetrack to top . . .

Drilling Supervisor / Morten Laget


PDF


Edit


INEOS
2276 – INEOS

Borgland Dolphin Drilling
Own Experience
Operational 6306/3-1 S
Fat Canyon
Intermediate section 07/11/2021 Decided to use the Franks casing circulating tool FA-1

Drilling Supervisor / Morten Laget


PDF


Edit


INEOS
2277 – INEOS

Borgland Dolphin Drilling
Own Experience
Operational 6306/3-1 S
Fat Canyon
Intermediate section 07/11/2021 It took 4,25 hrs to rig it up on Borgland Dolphin. The rigging up of casing tong and FMS slips . . .

Drilling Supervisor / Morten Laget


PDF


Edit


INEOS
2278 – INEOS

Borgland Dolphin Drilling
Own Experience
Operational 6306/3-1 S
Fat Canyon
Intermediate section 07/11/2021 We had several faults on the Franks equipment. This led to troubleshooting, phone calls to town, . . .

Drilling Supervisor / Morten Laget


PDF


Edit


INEOS
2279 – INEOS

Borgland Dolphin Drilling
Own Experience
Planning 6306/3-1 S
Fat Canyon
Intermediate section 07/11/2021 9 5/8″ float shoe filled up with mud.

Drilling Supervisor / Morten Laget


PDF


Edit


INEOS
2280 – INEOS

Borgland Dolphin Drilling
Own Experience
Operational 6306/3-1 S
Fat Canyon
Intermediate section 07/11/2021 Had initially many problems with Franks equipment that did not work, and cold windy weather outside . . .

Drilling Supervisor / Morten Laget


PDF


Edit


INEOS
2275 – INEOS

Borgland Dolphin Drilling
Own Experience
Operational 6306/3-1 S
Fat Canyon
Intermediate section 06/11/2021 Had two bit trips with very low, down to 1 m/hr ROP

Drilling Supervisor / Morten Laget


PDF


Edit


INEOS
3407 – INEOS

Borgland Dolphin Drilling
Own Experience
Operational PL937
Fat Canyon
Intermediate section 04/11/2021
ROP in 12 1/4″ section dropped to almost nothing at +/- 1900 m. Drilling parameters were varied, and . . .

/



PDF


Edit


INEOS
2269 – INEOS

Borgland Dolphin Drilling
Own Experience
Operational 6306/3-1 S
Fat Canyon
Intermediate section 31/10/2021 ROP dropped from 50 m/hr to 1 m/hr

Drilling Supervisor / Morten Laget