Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

INEOS
1529 – INEOS

Borgland Dolphin Drilling
Own Experience
Operational PL937
Fat Canyon
Top hole 01/10/2021 The conductor tally was not ready until last minute, and this created stress for the offshore . . .

/


PDF


Edit


DNO
2014 – DNO

Borgland Dolphin Drilling
Experience Transfer Meeting
Operational 2/5-15
Gomez
Surface section 14/08/2021 The Franks split bushing spider (SBS) did not fit inside the EMSCO rotary table on Borgland Dolphin.

Get in contact with Franks coordinator in town?
Drilling Supervisor / Morten Laget


PDF


Edit


PGNiG
356 – PGNiG

Deepsea Nordkapp Drilling Operational 6507/5-9 S, 6507/5-9 A
Shrek
Production section 22/10/2019 Used mousehole and bucking machine for offline operations.


PDF


Edit


PGNiG
357 – PGNiG

Deepsea Nordkapp Drilling Operational 6507/5-9 S, 6507/5-9 A
Shrek
Production section 22/10/2019 Casing running performance was good.


PDF


Edit


PGNiG
369 – PGNiG

Deepsea Nordkapp Drilling Operational 6507/5-9 S, 6507/5-9 A
Shrek
Reservoir section 22/10/2019 Difficult to decide on placement of centralizers for racking since the casing joints vary in lengths . . .


PDF


Edit


DNO
1217 – DNO

Borgland Dolphin Drilling
Experience Transfer Meeting
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
Production section 24/03/2012
DONG handover documentation:
When circulating prior to cementing initial pressure was 79 bar / . . .

Karina Helle / Morten Laget


PDF


Edit


DNO
1218 – DNO

Borgland Dolphin Drilling
Experience Transfer Meeting
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
Production section 24/03/2012 DONG handover documentation: The Odfjell CRTi (Casing Running Tool internal) was used to fill casing . . .

If using CRTi as a contingenct again is should be used together with auto filling shoe, this way . . .
Karina Helle / Morten Laget


PDF


Edit


DNO
1216 – DNO

Borgland Dolphin Drilling
Experience Transfer Meeting
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
Production section 11/03/2012 DONG handover documentation: While running the 13 3/8″ casing, the casing tong was not lowered all . . .

Karina Helle / Morten Laget


PDF


Edit


DNO
1215 – DNO

Borgland Dolphin Drilling
Experience Transfer Meeting
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
Reservoir section 10/03/2012 DONG handover documentation: All joints for the 13 3/8″ casing came out with DL connections . . .