Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

INEOS
2316 – INEOS

Borgland Dolphin Drilling
Own Experience
Operational 6306/3-1 S
Fat Canyon
Production section 09/12/2021 Extremeley slow drilling. At worst it was down to 1-2m/hr. At best it was 9-12m/hr.

Steinar Aarnes / Morten Laget


PDF


Edit


INEOS
2317 – INEOS

Borgland Dolphin Drilling
Own Experience
Operational 6306/3-1 S
Fat Canyon
Production section 09/12/2021
Extremely slow progress ranging from 1-10m/hr.
Likely due to sweeling/stickyness of clay due to use . . .

Steinar Aarnes / Morten Laget


PDF


Edit


INEOS
2318 – INEOS

Borgland Dolphin Drilling
Own Experience
Operational 6306/3-1 S
Fat Canyon
Production section 09/12/2021
The used 9 5/8″ casing was run quite smoothly. Not a single joint rejected, and Frank’s tongs . . .

Steinar Aarnes / Morten Laget


PDF


Edit


INEOS
2320 – INEOS

Borgland Dolphin Drilling
Own Experience
Operational 6306/3-1 S
Fat Canyon
Production section 09/12/2021
Managed to barely land the casing in very sticky clay.

Since the mainbore 9 5/8″ casing became . . .

Steinar Aarnes / Morten Laget


PDF


Edit


INEOS
2303 – INEOS

Borgland Dolphin Logistics
Own Experience
Operational 6306/3-1 S
Fat Canyon
Production section 14/11/2021 The BHA was sent from Stavanger to Kristiansund, and after screening the loadout list from . . .

Drilling Engineer / Morten Laget


PDF


Edit


INEOS
2302 – INEOS

Borgland Dolphin Drilling
Own Experience
Operational 6306/3-1 S
Fat Canyon
Production section 10/11/2021 Went down with 9 5/8″ cutters and cut the casing, observed 75 bar pressure drop and torque drop to . . .

Drilling Engineer / Morten Laget


PDF


Edit


INEOS
2273 – INEOS

Borgland Dolphin Logistics
Own Experience
Operational 6306/3-1 S
Fat Canyon
Production section 05/11/2021 During operation drilling did go slower than expected and way too often the boats has to go to the . . .

Drilling Engineer / Morten Laget


PDF


Edit


INEOS
2272 – INEOS

Borgland Dolphin Logistics
Own Experience
Operational 6306/3-1 S
Fat Canyon
Production section 04/11/2021 SLB D&M sends out several 8ft containers only filled with for examples batteries. One therefore . . .

Drilling Engineer / Morten Laget


PDF


Edit