Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

PGNiG
8276 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Intermediate section 15/02/2025 Stabilizer to close to pin end – not able to make up with hydra tong. Had to use rig tongs.

Drilling Engineer


PDF


Edit


PGNiG
8277 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Intermediate section 15/02/2025 Losses and pack off during the circulation. Total losses in the end with 100 lpm.

Drilling Engineer


PDF


Edit


PGNiG
8278 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Intermediate section 15/02/2025 The deck tally was made without the mitsui numbers, so not possible to control check the lengths. . . .

Drilling Engineer


PDF


Edit


PGNiG
8279 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Intermediate section 15/02/2025 During 13 3/8” CSG job, the tong derailed a few times.

Drilling Engineer


PDF


Edit


PGNiG
8280 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Intermediate section 15/02/2025 The middle of the cement job was pumped with wrong additives concentration – extra retarder was . . .

Drilling Engineer


PDF


Edit


PGNiG
4841 – PGNiG

Deepsea Yantai Drilling
Own Experience
Operational 6608/1-1 S Intermediate section 04/09/2022 Had to switch to a BX elevator

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4762 – PGNiG

Deepsea Yantai Drilling
Own Experience
Planning Copernicus Intermediate section 22/08/2022 4-string contingency scenario was miscommunicated and we did not have the 13 3/8″ SSRII landing . . .