Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

Wellesley
5840 – Wellesley

Deepsea Yantai Drilling Planning 35/10-10S
Carmen
Intermediate section 20/06/2023 It was run according to tally.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5835 – Wellesley

Deepsea Yantai Drilling
Own Experience
Planning 35/10-10S
Carmen
Surface section 16/06/2023 Crossovers supplied were of very different lengths: 4m, 6m and 12m.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5836 – Wellesley

Deepsea Yantai Drilling
Own Experience
Planning 35/10-10S
Carmen
Top hole 16/06/2023 The casing string run was a mixed string of VAM TOP and VAM 21 with VAP TOP run first. This meant . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5837 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Surface section 16/06/2023 Pups could not be run from aux using the “handshake” technique (too short for the Hydraracker) and . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5157 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Production section 24/04/2023 It was done before the cementer got the change to da a pre-job check / install bypass baffle etc.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5139 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Surface section 13/04/2023
NPT: 1.25 hrs
Cost: 260 417 NOK

Performed mechanical repair on make/break cylinder on casing . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5140 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Surface section 13/04/2023
NPT: 0.75 hrs
Cost: 156 250 NOK

Observed poor make-up of jt #204 into jt #111:
– No shoulder . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5131 – Wellesley

No Rig Drilling Operational No well Surface section 10/04/2023 Difficulties passing 20″ CSG shoe through FMS. Engaged CRTi and pushed through.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5121 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Surface section 09/04/2023 Did not observe a shoulder making the casing up to 27 500 ft-lbs.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5122 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Surface section 09/04/2023 The shoetrack was made up to 27,500 ft.lbs.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5115 – Wellesley

Deepsea Yantai Drilling Operational Eirik (OMV) Production section 30/03/2023 If we are leaning to one of the sides it is easy to hang up in something which can result in a . . .

Sander Schaathun / Morten Laget


PDF


Edit


Wellesley
2325 – Wellesley

Borgland Dolphin Drilling
Own Experience
Operational 36/1-4
Hemispheres
Top hole 24/12/2021
The deck-crew on days started to lay out slick joints in one bay before a crew change happened in . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
2321 – Wellesley

Borgland Dolphin Drilling
Own Experience
Operational 36/1-4
Hemispheres
Top hole 23/12/2021 o At 281m conductor couldn’t pass due to the tight spot observed when drilling there. Attempted to . . .

Drilling Engineer / Morten Laget


PDF


Edit