Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
6810 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Failure of Dril-quip lifting eyes while laying out the diverter from vertical to horizontal . . .

Lene Lomeland


PDF


Edit


Wellesley
258 – Wellesley

Transocean Arctic Drilling Operational 35/4-2
Songesand
Reservoir section 16/06/2020 The mud engineer made a good displacement plan for displacing the well from SW to 1.25 sg mud. The . . .


PDF


Edit


PGNiG
373 – PGNiG

Deepsea Nordkapp Drilling Operational 6507/5-9 S, 6507/5-9 A
Shrek
Reservoir section 22/10/2019
Odfjell changing out parts of Management (TSL, DSL, OIM) to attend 3 day leadership seminar onshore. . . .


PDF


Edit


Wellesley
211 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Production section 07/02/2019 The pump strokes and volume pumped (from pit sensors) matched very well from 0-83 m3 mud pumped . . .


PDF


Edit


Wellesley
213 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Production section 07/02/2019 Trip sheet from Geoservice and Transocean has shown different numbers. In addition, gains have been . . .


PDF


Edit


Wellesley
214 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Reservoir section 07/02/2019 Investigated two sensor systems in TT.


PDF


Edit


Wellesley
201 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Production section 05/02/2019 Tried to shear OBM mud in pits before drilling the 12 1/4″ section. At this time the well and all . . .


PDF


Edit


Wellesley
202 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
N/A 05/02/2019 Operating with 5 deck crew, as specified in the contract, does not allow for utilizing two deck . . .


PDF


Edit


Wellesley
203 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
N/A 05/02/2019 Column tank ST3 which was previously used for brine storage has within the last two years been . . .


PDF


Edit


DNO
329 – DNO

Island Innovator Drilling Planning 6507/7-16 S
Canela
P&A 07/01/2019 During M/U of 20″x36″ cutting assembly (MOST tool), had to break off MOST tool above space out pup . . .