Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

PGNiG
4842 – PGNiG

Deepsea Yantai Marine
Own Experience
Operational 6608/1-1 S
Copernicus
Rig move 09/09/2022 Marine reps identified possibility to start transit 2hrs before de-ballasting was completed. This . . .

Stian Engvik / Morten Laget


PDF


Edit


PGNiG
4843 – PGNiG

Deepsea Yantai Marine
Own Experience
Operational 6608/1-1 S
Copernicus
Rig move 09/09/2022 Bridge and marine reps was not informed from DSV or DE when required spud equipment was taken . . .

Stian Engvik / Morten Laget


PDF


Edit


PGNiG
4844 – PGNiG

Deepsea Yantai Marine
Own Experience
Operational 6608/1-1 S
Copernicus
Top hole 09/09/2022
Everything went according to plan and logging was done remotely. Final position report was delivered . . .

Stian Engvik / Morten Laget


PDF


Edit


PGNiG
4834 – PGNiG

Deepsea Yantai Drilling
Own Experience
Planning 6608/1-1 S
Copernicus
Other 04/09/2022 When running of 20″ x 13 3/8″ casing was planned to be on Sunday 4/9/22 we tried to get surge . . .

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4835 – PGNiG

Deepsea Yantai Drilling
Own Experience
Operational 6608/1-1 S
Copernicus
Surface section 04/09/2022
When the rig reached a TD of 1100 m and no contingency 4-string design was needed anymore, the 20″ . . .

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4840 – PGNiG

Deepsea Yantai Logistics
Own Experience
Operational 6608/1-1 S
Copernicus
Top hole 04/09/2022 With good planning and cooperation, everything shipped to SSJ prior to operation start in due time. . . .

Johan Kjos-Hanssen / Morten Laget



PDF


Edit


PGNiG
4841 – PGNiG

Deepsea Yantai Drilling
Own Experience
Operational 6608/1-1 S Intermediate section 04/09/2022 Had to switch to a BX elevator

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4830 – PGNiG

Deepsea Yantai Marine
Own Experience
Operational 6608/1-1 S
Copernicus
Rig move 29/08/2022 All tubulars were backloaded from the rig and mud and bulk tanks emptied. The rig was deballasted to . . .

Phil Hardy / Morten Laget


PDF


Edit


PGNiG
4947 – PGNiG

Deepsea Yantai HSEQ
Own Experience
Planning 6608/1-1 S
Copernicus
26/08/2022

/ Ã…se Kristin Pettersen



PDF


Edit


PGNiG
4763 – PGNiG

Deepsea Yantai Marine
Own Experience
Planning Copernicus Rig move 23/08/2022 Mooring analysis was requested at an early stage of the planning fase, but was not taken into . . .

Stian Engvik / Morten Laget


PDF


Edit


PGNiG
4764 – PGNiG

Deepsea Yantai HSEQ
Own Experience
Planning 6608/1-1 Other 23/08/2022 DSY waste management plan is according to IMO, and does not conflict with NOROG 093. It was . . .

Christina Sæland Rødne / Christina Sæland Rødne


PDF


Edit


PGNiG
4765 – PGNiG

Deepsea Yantai Drilling
Own Experience
Planning Copernicus Surface section 23/08/2022 The use of normal HWDP Requires double handling from fingerboard to well center when running and . . .

Richard Mollison / Morten Laget


PDF


Edit


PGNiG
4762 – PGNiG

Deepsea Yantai Drilling
Own Experience
Planning Copernicus Intermediate section 22/08/2022 4-string contingency scenario was miscommunicated and we did not have the 13 3/8″ SSRII landing . . .

Richard Mollison / Morten Laget



PDF


Edit


DNO
4761 – DNO

No Rig Drilling
Own Experience
Planning No well N/A 10/08/2022 In DG1-DG2 rig screening strategy the project landed on 1.5 or Dual derrick rig and all time and . . .

Zol Mollaeian / Sigve K. Næsheim


PDF


Edit


Wellesley
3373 – Wellesley

Borgland Dolphin Marine
Own Experience
Operational 36/1-4
Hemispheres
Rig move 18/02/2022 Uncontrolled runout of anchor and chain

Stian Engvik / Morten Laget



PDF


Edit


Wellesley
3246 – Wellesley

Borgland Dolphin Drilling
Own Experience
Operational 36/1-4
Hemispheres
P&A 29/01/2022
Cement plug was pumped without incident, POOH through cement was without incident. Circulated clean . . .

Drilling Supervisor / Morten Laget



PDF


Edit


Wellesley
3241 – Wellesley

Borgland Dolphin HSEQ
Own Experience
Operational 36/1-4
Hemispheres
N/A 28/01/2022 There was a dropped object (DO) incident onboard BGL, and DO is not included in the reporting & . . .

Anniken Meisler / Morten Laget


PDF


Edit


Wellesley
4487 – Wellesley

Borgland Dolphin Logistics
Own Experience
Planning 36/1-4
Hemispheres
Other 15/01/2022 Another operator with the same rig chooses other vessels for a short well. Rig IDC, PSV’s not IDC . . .

Johan Kjos-Hanssen / Morten Laget



PDF


Edit


Wellesley
2413 – Wellesley

Borgland Dolphin Drilling
Own Experience
Operational 36/1-4
Hemispheres
Surface section 04/01/2022
Ahead of a connection at 1146m (105m below the 13 3/8″ shoe), a blockage occurred in the cuttings . . .

Drilling Supervisor / Morten Laget


PDF


Edit


Wellesley
2409 – Wellesley

Borgland Dolphin Drilling
Own Experience
Operational 36/1-4
Hemispheres
Top hole 01/01/2022 When making up 18 3/4″ WHH to No Cross joint it was very tight clearance for upper and lower jaws to . . .

Drilling Supervisor / Morten Laget


PDF


Edit