Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
8200 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Surface section 02/02/2025 Difficulties spinning in and M/U 7” Tubing.

Stein-Petter Slatlem / Stig Seland


PDF


Edit


DNO
8201 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Surface section 02/02/2025 Low ROP caused by worn out bit and balling.

Stein-Petter Slatlem / Stig Seland


PDF


Edit


DNO
8202 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Surface section 02/02/2025
Hal Foam cementers had a check of line-up and inspected filter unit. Found a lot of Cement debris . . .

Stein-Petter Slatlem / Stig Seland


PDF


Edit


PGNiG
7698 – PGNiG

Deepsea Yantai HSEQ
PSA Q&A
Planning 6501/10-1
Tomcat
Other 06/12/2024

Question 1. Brønn 6305/10-1 «Tomcat» er definert som en exploration well. Vi ber om bekreftelse på . . .

Åse Kristin Pettersen / Stig Seland



PDF


Edit


Wellesley Petroleum
7699 – Wellesley Petroleum

Deepsea Yantai HSEQ
PSA Q&A
Planning No well N/A 06/12/2024

Sp. Mål. 1. Kap 9.3 tredje avsnitt om trafikkovervåkning står det følgende «If any irregularities . . .

Åse Kristin Pettersen / Morten Laget



PDF


Edit


DNO
6960 – DNO

Deepsea Yantai External Environment
Own Experience
Other 25/7-11 S
Norma
Other 06/11/2024
Tilbakemelding fra NEA:
Vi registrerer at rapportert forbruk av diesel til kraftgenerering er . . .

Helene Folkvord / Anniken Meisler



PDF


Edit


PGNiG
6747 – PGNiG

Deepsea Yantai Marine
Own Experience
Operational 6501/10-1
Tomcat
Pre-Lay 15/09/2024
We started on anchor 4. This anchor was together with anchor 5 and 6 supposed to be installed to . . .

Stian Engvik / Stig Seland


PDF


Edit


PGNiG
6223 – PGNiG

Deepsea Yantai HSEQ
Own Experience
Planning 6501/10-1
Tomcat
Other 08/05/2024
An evaluation of some changes was not documented.
A MOC process should cover any RELEVANT changes . . .

Åse Kristin Pettersen / Stig Seland


PDF


Edit


Wellesley
6060 – Wellesley

Deepsea Yantai 35/10-10S
Carmen
Top hole 21/12/2023

Drilling Engineer


PDF


Edit


Wellesley
5937 – Wellesley

Deepsea Yantai Drilling
Own Experience
INTERNAL
Operational 35/10-10S
Carmen
Other 24/10/2023 During operation several MoC’s were made. A link to the risk register was enclosed in the MoC . . .

Åse Kristin Pettersen


PDF


Edit


Wellesley
5936 – Wellesley

Deepsea Yantai Marine
Own Experience
Operational 35/10-10S
Carmen
CAN-Ductor 23/10/2023 Risk of WOW during Carmen CAN-Ductor installation and recovery leading to Wellesley being . . .

Stian Engvik / Morten Laget


PDF


Edit


DNO
5927 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
N/A 19/09/2023 Mud cooler was used frequently throughout the wells. It was mobilized during Eirik and rigged up . . .

John Langelandsvik / Morten Laget


PDF


Edit


DNO
5923 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Reservoir section 17/09/2023 While sampling the MDT Saturn probe got stuck. All attempts to free with wireline tension, cycling . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5924 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Reservoir section 17/09/2023 Side door overshot had to be run (provided by Archer with Archer-supplied procedures)

Drilling Engineer


PDF


Edit


DNO
5920 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
Reservoir section 11/09/2023 The cap rock was longer than anticipated, difference form mainbore. The core jammed off in the . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5921 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
Reservoir section 11/09/2023 Core jammed off on all 3 cores.

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5922 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
Reservoir section 11/09/2023 The BHA took weight on the way down in open hole. Had to ream down on several of the core runs. On . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5919 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
N/A 10/09/2023 Done as per plan. For the coring operations a new LCM pill was mixed. The LCM from the 8 1/2″ . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5912 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
N/A 06/09/2023 Plugging of transfer lines when taking Microbar from vessels several times.

John Langelandsvik / Morten Laget


PDF


Edit


DNO
5908 – DNO

Deepsea Yantai Operational 25/7-11 S
Norma
Reservoir section 05/09/2023 Wireline crew informed in the lesson learned meeting that it was some confusion on when to fire jar . . .

Drilling Engineer / Morten Laget


PDF