Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

Wellesley
553 – Wellesley

Borgland Dolphin Drilling Operational 6204/11-3
Schweinsteiger
P&A 21/09/2020
Re-dressed DQ MPT tool after retrieving 9 5/8″ wear bushing. RIH and jetted through BOP at high rate . . .

Drilling Supervisor


PDF


Edit


Wellesley
519 – Wellesley

Borgland Dolphin Drilling Planning 6204/11-3
Schweinsteiger
P&A 17/09/2020 Evaluated if joining the Rig Chase Campaign would be beneficial compared to the original plan using . . .

Elisabeth Vik


PDF


Edit


Wellesley
250 – Wellesley

Transocean Arctic Drilling Operational 35/11-21 A
Grosbeak
P&A 16/06/2020 N/A


PDF


Edit


Wellesley
251 – Wellesley

Transocean Arctic Drilling Operational 35/11-21 A
Grosbeak
P&A 16/06/2020 N/A


PDF


Edit


Wellesley
261 – Wellesley

Transocean Arctic Drilling Operational 35/4-2
Songesand
P&A 16/06/2020 After unlatching the BOP we forgot to remove the AX ring from the wellhead prior to pulling the BOP. . . .


PDF


Edit


Wellesley
262 – Wellesley

Transocean Arctic Drilling Operational 35/4-2
Songesand
P&A 16/06/2020 The Weatherford MOST tool was successfully used in rotary mode. The tool was dressed such that the . . .


PDF


Edit


Wellesley
263 – Wellesley

Transocean Arctic Drilling Operational 35/4-2
Songesand
P&A 16/06/2020 As on all previous wells, with the well displaced to seawater and wellhead cutting operations . . .


PDF


Edit


Wellesley
265 – Wellesley

Transocean Arctic Drilling Operational 25/1-13
Balcom
P&A 16/06/2020 Unable to run Weatherford 9 5/8″ casing cuting assembly past wellhead. Found out that spiral . . .


PDF


Edit


DNO
1236 – DNO

Borgland Dolphin Other
PSA Findings
Other A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 20/11/2019

Karina Helle / Morten Laget


PDF


Edit


DNO
1233 – DNO

Borgland Dolphin Other
PSA Findings
Other A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 08/10/2019

Karina Helle / Morten Laget


PDF


Edit


Faroe
279 – Faroe

Transocean Arctic Drilling Operational 30/6-30
Rungne
P&A 01/10/2019 Had to remove top stabbing guide on IRN to be able to M/U MPT (45 cm handling pup below). Reason for . . .


PDF


Edit


Faroe
280 – Faroe

Transocean Arctic Drilling Operational 30/6-30
Rungne
P&A 01/10/2019 Weatherford Whirl Tool, part of Wellbore Cleanout Tools used for brushing riser and jetting BOP. OD . . .


PDF


Edit


Faroe
281 – Faroe

Transocean Arctic Drilling Operational 30/6-30
Rungne
P&A 01/10/2019 Bent two singles 5 1/2″ HWDP while tagging top of surfacec cement plug after pulling BOP.


PDF


Edit


Faroe
282 – Faroe

Transocean Arctic Drilling Operational 30/6-30
Rungne
P&A 01/10/2019 Thread on tension mandrel was damaged in town (used for connecting Weatherford MOST tool to rotary . . .


PDF


Edit


Faroe
283 – Faroe

Transocean Arctic Drilling Operational 30/6-30
Rungne
P&A 01/10/2019 Used smaller “Sea Owl” for subsea observation while cutting surface casing strings. This allowed . . .


PDF


Edit


Faroe
284 – Faroe

Transocean Arctic Drilling Operational 30/6-30
Rungne
P&A 01/10/2019 The 18 3/4″ HP housing lock ring released after cutting the 20″ casing with 20 mt overpull. . . .


PDF


Edit


Wellesley
221 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
P&A 07/02/2019 Not enough cuttings skips for P&A cement plugs.


PDF


Edit


Wellesley
222 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
P&A 07/02/2019 Halliburton planned for 15 m3 spacer for an 11 m3 slurry volume.


PDF


Edit


Wellesley
223 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
P&A 07/02/2019


PDF


Edit


Wellesley
224 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
P&A 07/02/2019 WOC for cement plugs in OBM prior to dressing off.