WE Report

Lessons Learned

Lessons Learned865


Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
5856 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 Used the ROV dredging around the conductor after drilling the 9 7/8″ Pilot hole. The cleaning with . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5857 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 Due to problems with cement around the conductor and movement in conductor a clamp-on inclinometer . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5858 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 Due to problems with cement around the conductor and movement in conductor a Bullseye bracket from . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5859 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 Drawwork in landing mode. No change in hookload while cementing and displacing.

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5861 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 Difficult to see cement in return due to poor visibility at seabed. pH sniffer indicated cement in . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5862 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 When displacing the 26″ hole at TD a large volume of WBM was needed. And due to VDL the mud column . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5863 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 Everything went according to plan, no hole problems. Not much mud left.

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5864 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
BOP running 30/07/2023 Used two ROVs to guide the BOP on top of WHH. No problems.

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5865 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Surface section 30/07/2023 Problems in start of 17 1/2″ Section with plug in blower system to ISO tanks. Few skips in field.

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5867 – DNO

Deepsea Yantai Subsurface
Own Experience
Operational 25/7-11 S
Norma
Surface section 30/07/2023 New version of the Gravitas earlier used. The WSG not used to the new version.

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5868 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Surface section 30/07/2023
The drill commenced with the Driller pressuring up the well with 30 bar.
The classic method of . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5869 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Surface section 30/07/2023 From the start of the section after the FIT, delivery of cuttings to the ISO tanks using the CCBs . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5845 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
P&A 12/07/2023 Pulled casing hanger with upper annular closed and C&K lines closed.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5844 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10 A
Carmen
Production section 10/07/2023 Needed several trips with the tool up in the casing to cool it down.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5839 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Intermediate section 20/06/2023 The cement didn’t set up as expected.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5837 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Surface section 16/06/2023 Pups could not be run from aux using the “handshake” technique (too short for the Hydraracker) and . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5833 – Wellesley

Deepsea Yantai Other Operational 35/10-10S
Carmen
N/A 13/06/2023 Unable to lift the BOP elevator with LMRP past fixed guide/bumper beams in moonpool. LMRP diameter . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5186 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Reservoir section 20/05/2023
Drilled 8 1/2″ section with 5 7/8″ DP with 1400-1500 lpm and low ROP, saw ECD up to 18 points.
MW . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5184 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Reservoir section 18/05/2023 Managed to fish roughly 1/2 of junk in hole that accumulated in junk basket (some was seen over . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5185 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Reservoir section 18/05/2023 On second MDT got stuck with Saturn packer and had to release electrical cable head and fish . . .

Drilling Engineer / Morten Laget


PDF


Edit