Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
6759 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 The flowrate during cleanout of conductor was limited to 2000 lpm due to overflow of bird bath. . . .

Lene Lomeland


PDF


Edit


DNO
6761 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 Longer time than anticipated for grinding the weld on conductor.

Lene Lomeland


PDF


Edit


PGNiG
6747 – PGNiG

Deepsea Yantai Marine
Own Experience
Operational 6501/10-1
Tomcat
Pre-Lay 15/09/2024
We started on anchor 4. This anchor was together with anchor 5 and 6 supposed to be installed to . . .

Stian Engvik / Stig Seland


PDF


Edit


Wellesley
6455 – Wellesley

COSLPromoter Drilling
Own Experience
Operational 35/10-12 S
Gnomoria
P&A 05/07/2024 Observed flowback of the mud lost while running and cementing 9 5/8″ casing. Of ±200 m3 of mud lost, . . .

Drilling Engineer / Morten Laget



PDF


Edit


Wellesley Petroleum
6454 – Wellesley Petroleum

COSLPromoter, COSL Promoter External Environment
Own Experience
Operational 35/11-5, 39/11-29S
Toppand East
Other 02/07/2024
Recieved phonecall from SAR Florø which have not been informed about Toppand East well. The waste . . .

Helene Folkvord


PDF


Edit


Wellesley
6391 – Wellesley

COSLPromoter Drilling
Own Experience
Planning 35/10-12AS
Gnomoria
Surface section 12/06/2024 Not possible to M/U the no-cross joint, because it was not possible to grip with the casing tong on . . .

Giacomo Bonomo / Morten Laget



PDF


Edit


Wellesley
6368 – Wellesley

COSLPromoter, COSL Promoter Drilling
Own Experience
Operational 35/11-5, 39/11-29S
Toppand East
Reservoir section 06/06/2024 The BOP test tool could not be used, because one of the TJ was in conflict with the LPR. The TJ . . .

Giacomo Bonomo / Morten Laget



PDF


Edit


Wellesley Petroleum
6255 – Wellesley Petroleum

COSLPromoter HSEQ
Own Experience
Planning 35/11-29 S
Toppand East
Other 30/05/2024 During the operation (22.05.24) an observation card was written that there was not a proper . . .

Åse Kristin Pettersen / Åse Kristin Pettersen



PDF


Edit


PGNiG
6223 – PGNiG

Deepsea Yantai HSEQ
Own Experience
Planning 6501/10-1
Tomcat
Other 08/05/2024
An evaluation of some changes was not documented.
A MOC process should cover any RELEVANT changes . . .

Åse Kristin Pettersen / Stig Seland


PDF


Edit


PGNiG
6874 – PGNiG

No Rig Other
Own Experience
Planning 6501/10-1
Tomcat
N/A 06/11/2023 It is strong currents at the location, and it was very hard to keep the ROV stable when surveying . . .

Anniken Meisler / Anniken Meisler



PDF


Edit


Wellesley
5937 – Wellesley

Deepsea Yantai Drilling
Own Experience
INTERNAL
Operational 35/10-10S
Carmen
Other 24/10/2023 During operation several MoC’s were made. A link to the risk register was enclosed in the MoC . . .

Åse Kristin Pettersen


PDF


Edit


Wellesley
5936 – Wellesley

Deepsea Yantai Marine
Own Experience
Operational 35/10-10S
Carmen
CAN-Ductor 23/10/2023 Risk of WOW during Carmen CAN-Ductor installation and recovery leading to Wellesley being . . .

Stian Engvik / Morten Laget


PDF


Edit


DNO
5927 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
N/A 19/09/2023 Mud cooler was used frequently throughout the wells. It was mobilized during Eirik and rigged up . . .

John Langelandsvik / Morten Laget


PDF


Edit


DNO
5912 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
N/A 06/09/2023 Plugging of transfer lines when taking Microbar from vessels several times.

John Langelandsvik / Morten Laget


PDF


Edit


DNO
5870 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
31/07/2023 Due to build up of cuttings around the wellhead after drilling pilot hole the marker buoys was . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5852 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 The pH meter showed indications of cement in return (pH value of 11.6-12.3). Due to poor visibility . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5853 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 After the cement of the 30″ conductor was set up the WHRT was released and POOH. Movement was seen . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5856 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 Used the ROV dredging around the conductor after drilling the 9 7/8″ Pilot hole. The cleaning with . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5857 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 Due to problems with cement around the conductor and movement in conductor a clamp-on inclinometer . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5858 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 Due to problems with cement around the conductor and movement in conductor a Bullseye bracket from . . .

Drilling Engineer / Morten Laget


PDF


Edit


New Lesson Learned