WE Report

Lessons Learned

Lessons Learned865


Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
2006 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 02/08/2021 When pulling 13 3/8″ seal assembly on other wells the choke and kill line failsafes were open . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
2005 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 28/07/2021 Volume required was larger that expected for first 20 bar. However from 20 bar to 50 bar the volume . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
2004 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 27/07/2021
Franks tong was moved into the drill floor from the starboard tool landing are on the skate through . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1994 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H
Oselvar
P&A 21/07/2021 Bottom 0.5 m of the toolstring is the Ultrasonic rotating IBCS-E sub. This sub has a larger OD . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1993 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H
Oselvar
P&A 19/07/2021 Jacked 9 5/8″ free using Baker Mastodon jacking tool. Used 49 pressure cycles to jack casing 17 m, . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1992 – DNO

Borgland Dolphin C&P
Own Experience
INTERNAL
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 14/07/2021 Sometimes invoice dates does not match with actual backload dates

Drilling Engineer / Stig Seland



PDF


Edit


DNO
1990 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-3 HT2
Oselvar
P&A 13/07/2021 Set 20″ EZSV at 694,5 m according to procedure. Tagged EZSV with 10 t. Pressured up to 50 bar, no . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1991 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-3 HT2
Oselvar
P&A 13/07/2021 Pulled pack off assembly free. Flow checked well. Pulled MPT with pack off assembly above BOP. . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
2117 – DNO

Borgland Dolphin Logistics
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
Other 13/07/2021 Did not not get enough plates from rig and.

Johan Kjos-Hanssen / Stig Seland



PDF


Edit


DNO
1970 – DNO

Borgland Dolphin Drilling Operational A-3 HT2
Oselvar
P&A 05/07/2021 The 9 5/8″ casing hanger had a 10″ pup joint made up to it This was not identified on the hanger . . .

Drilling Engineer / Stig Seland



PDF


Edit


DNO
1969 – DNO

Borgland Dolphin Drilling Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 01/07/2021
Drill crew observed that Slips for perforating guns came out
to rig without handles.

Øystein Prytz / Stig Seland



PDF


Edit


DNO
1968 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 30/06/2021 Initially believed that we did not get a good pressure test (Formation Integrity Test). Suspected . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1930 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 29/06/2021 We had a lot of friction in a long and deviated well A3 with brine.

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1916 – DNO

Borgland Dolphin Logistics
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 23/06/2021 Cleaning of pulled XMT onshore at base. Major onshore handling operations.

Johan Kjos-Hanssen / Stig Seland



PDF


Edit


DNO
1554 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 03/06/2021 Overtorqued connection required cold cutting

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1547 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 29/05/2021 Camera not able to get a 360 view as it was off center

Lars Solvang / Stig Seland



PDF


Edit


DNO
1546 – DNO

Borgland Dolphin Multi Discipline
Own Experience
INTERNAL
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 27/05/2021 Unstable and sometimes no connection at all. Poor sound quality during meetings with the rig.

Øystein Prytz / Stig Seland



PDF


Edit


DNO
1532 – DNO

Borgland Dolphin Logistics
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
Other 26/05/2021 Delay on helicpoter with 3,5 hours. People hungry at the heliport and miss out the Lunch onboard the . . .

Johan Kjos-Hanssen / Stig Seland



PDF


Edit


DNO
1531 – DNO

Borgland Dolphin Logistics
Own Experience
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 21/05/2021 Max PAX during operations landed on 16 PAX in even good flying conditions and personnel was bumped . . .

Johan Kjos-Hanssen / Stig Seland



PDF


Edit


DNO
1466 – DNO

Borgland Dolphin Well test
Experience Transfer Meeting
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 09/05/2021
The distance between the Archer pump to grease head is 40+ meters, with the hose full of grease it . . .

Drilling Engineer / Stig Seland



PDF


Edit


New Lesson Learned

You do not have permission to view this form.




\n\t\t

\n\t\t\t\n\t\t\t