Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
315 – DNO

Island Innovator Drilling Planning 6507/7-16 S
Canela
Intermediate section 07/01/2019 Had to increase MW from the planned 1.48 sg to 1.52 sg at TD due to cavings.


PDF


Edit


DNO
317 – DNO

Island Innovator Drilling Operational 6507/7-16 S
Canela
Production section 07/01/2019 Drilled section with planned mud and mud weight without problems with cavings. Cavaings identified . . .


PDF


Edit


DNO
318 – DNO

Island Innovator Drilling Planning 6507/7-16 S
Canela
N/A 07/01/2019 Used the 1 x 2 m pup, had we crossed threads we had no back-up.


PDF


Edit


DNO
320 – DNO

Island Innovator Drilling Operational 6507/7-16 S
Canela
Production section 07/01/2019 Great care taken breaking circulation at casing TD/washing down to land off. Used 100 lpm steps, . . .


PDF


Edit


DNO
321 – DNO

Island Innovator Drilling Operational 6507/7-16 S
Canela
Production section 07/01/2019 High values of LOT/FIT expected; 1.95 sg EMW. Value of ESD measured by LWD tool ahead of FIT was . . .


PDF


Edit


DNO
323 – DNO

Island Innovator Drilling Operational 6507/7-16 S
Canela
N/A 07/01/2019 Unplanned contamination of Versatec 1.52 sg OBM with DW – OWR increased from 70/30 to 60/40. Checked . . .


PDF


Edit


DNO
324 – DNO

Island Innovator Drilling Operational 6507/7-16 S
Canela
Reservoir section 07/01/2019 …., F/C at shoe, 400 liter gain in trip tank. Closed in well, checked for PBU (none), RIH to TD, . . .


PDF


Edit


DNO
325 – DNO

Island Innovator Drilling Planning 6507/7-16 S
Canela
N/A 07/01/2019 Only one subsea engineer on rig.


PDF


Edit


DNO
326 – DNO

Island Innovator Drilling Planning 6507/7-16 S
Canela
N/A 07/01/2019 Fluid slopping into flowline from shaker pits due to Free Surface Effect during periods of high rig . . .


PDF


Edit


DNO
327 – DNO

Island Innovator Drilling Operational 6507/7-16 S
Canela
Reservoir section 07/01/2019 ESD accidentally operated in wireline unit.


PDF


Edit


DNO
328 – DNO

Island Innovator Drilling Operational 6507/7-16 S
Canela
P&A 07/01/2019 During POOH with 9 5/8″ cutting assembly the pipe lifted out of slips due to knives hanging up in WB . . .


PDF


Edit


DNO
329 – DNO

Island Innovator Drilling Planning 6507/7-16 S
Canela
P&A 07/01/2019 During M/U of 20″x36″ cutting assembly (MOST tool), had to break off MOST tool above space out pup . . .


PDF


Edit


Faroe
277 – Faroe

Transocean Arctic Drilling Operational 30/6-30
Rungne
Reservoir section 01/01/2019 Made first connection on core BHA #3. This 64 m core BHA would require 2 connections on bottom. . . .


PDF


Edit


Faroe
278 – Faroe

Transocean Arctic Drilling Operational 30/6-30
Rungne
Reservoir section 01/01/2019 During POOH with coring assembly #3, took 70 mt overpull at 3250 m. After pulling further 9 m, got a . . .


PDF


Edit


Wellesley
1126 – Wellesley

Transocean Arctic Drilling
PSA Q&A
Planning 35/12-7
Serin
N/A 06/04/2018

Blowout & Kill simulation report: Maximum oil blowout rate for the Serin well was found to . . .

Karina Helle / Morten Laget


PDF


Edit


Faroe
157 – Faroe

Deepsea Bergen Drilling Operational 31/7-2 S
Brasse Appraisal
P&A 28/09/2017 Drilled 36″ hole with 36″ bit at 21 m/hr on bottom ROP without problems maintaining verticality.


PDF


Edit


Faroe
158 – Faroe

Deepsea Bergen Drilling Operational 31/7-2 S
Brasse Appraisal
Top hole 28/09/2017 Problems to close the 30″ side door elevator due to shackles. Removed shackles and connected the 500 . . .


PDF


Edit


Faroe
159 – Faroe

Deepsea Bergen Drilling Operational 31/7-2 S
Brasse Appraisal
Surface section 28/09/2017 Painted lengths on 13 3/8″ casing from town was actual lengths, not M/U lengths. This might cause . . .


PDF


Edit


Faroe
160 – Faroe

Deepsea Bergen Drilling Operational 31/7-2 S
Brasse Appraisal
Surface section 28/09/2017 During M/U 18 3/4″ WHH, threads got cross threaded from side to side when moving the 18 3/4″ WHH. . . .


PDF


Edit


Faroe
161 – Faroe

Deepsea Bergen Drilling Operational 31/7-2 S
Brasse Appraisal
Intermediate section 28/09/2017 Remote on Cement head did not work. Had to operate manually by man in riding belt. The tool worked . . .


PDF


Edit