WE Report

Lessons Learned

Lessons Learned865


Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
5868 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Surface section 30/07/2023
The drill commenced with the Driller pressuring up the well with 30 bar.
The classic method of . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5869 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Surface section 30/07/2023 From the start of the section after the FIT, delivery of cuttings to the ISO tanks using the CCBs . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5845 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
P&A 12/07/2023 Pulled casing hanger with upper annular closed and C&K lines closed.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5835 – Wellesley

Deepsea Yantai Drilling
Own Experience
Planning 35/10-10S
Carmen
Surface section 16/06/2023 Crossovers supplied were of very different lengths: 4m, 6m and 12m.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5836 – Wellesley

Deepsea Yantai Drilling
Own Experience
Planning 35/10-10S
Carmen
Top hole 16/06/2023 The casing string run was a mixed string of VAM TOP and VAM 21 with VAP TOP run first. This meant . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5837 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Surface section 16/06/2023 Pups could not be run from aux using the “handshake” technique (too short for the Hydraracker) and . . .

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
5834 – PGNiG

Deepsea Yantai Drilling
Own Experience
Planning 6305/10-1
Tomcat
N/A 15/06/2023
BO&K Analysis performed in Aug 2022, with a sensitivity on revised reservoir data.

The . . .

Richard Mollison / Morten Laget



PDF


Edit


Wellesley
5186 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Reservoir section 20/05/2023
Drilled 8 1/2″ section with 5 7/8″ DP with 1400-1500 lpm and low ROP, saw ECD up to 18 points.
MW . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5184 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Reservoir section 18/05/2023 Managed to fish roughly 1/2 of junk in hole that accumulated in junk basket (some was seen over . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5185 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Reservoir section 18/05/2023 On second MDT got stuck with Saturn packer and had to release electrical cable head and fish . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5157 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Production section 24/04/2023 It was done before the cementer got the change to da a pre-job check / install bypass baffle etc.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5141 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Intermediate section 13/04/2023 Not approved pressure test. Downtime to drilling contractor.

Drilling Engineer / Morten Laget



PDF


Edit


Wellesley
5127 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Surface section 10/04/2023 Not enough deckspace to place shoe and sting-in float. Had to be laid in riser bay.

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5097 – DNO

Deepsea Yantai Multi Discipline
Own Experience
INTERNAL
Planning 25/7-11 S Other 22/03/2023 Drilling Engineers have been using online software called The Engineering ToolBox. This software . . .

Stian Engvik / Morten Laget


PDF


Edit


DEA
5072 – DEA

No Rig HSEQ
Own Experience
INTERNAL
No well N/A 17/02/2023
Feedback:
– Likte rebusløpet veldig godt. Samme med Quiz, men kanskje ha den litt kortere. Og . . .

Karina Helle / Anniken Meisler


PDF


Edit


Wellesley
4960 – Wellesley

Borgland Dolphin Logistics
Own Experience
End of Well 36/1-4
Hemispheres
Other 14/12/2022 Sevaral months after end of operation personnel on Saga Fjordbase found a full mudskip left after . . .

Johan Kjos-Hanssen / Morten Laget



PDF


Edit


PGNiG
4923 – PGNiG

Deepsea Yantai Logistics
Own Experience
Planning 6608/1-1 S
Copernicus
Other 03/10/2022 With this focus the mobilization plan became a live document and with a weekly focus, ensuring all . . .

Johan Kjos-Hanssen / Morten Laget



PDF


Edit


PGNiG
4914 – PGNiG

Deepsea Yantai HSEQ
Own Experience
INTERNAL
End of Well 6608/1-1 S
Copernicus
Other 26/09/2022 We didn’t ask of information from the DSV during the operation

Ã…se Kristin Pettersen / Morten Laget


PDF


Edit


PGNiG
4921 – PGNiG

Deepsea Yantai Logistics
Own Experience
Operational 6608/1-1 S
Copernicus
Other 20/09/2022 Due to late busy vessel schedule of PSV and MI Swaco vessel MS Norbar, mud for 8-1/2″ Section was . . .

Johan Kjos-Hanssen / Morten Laget



PDF


Edit


PGNiG
4922 – PGNiG

Deepsea Yantai Logistics
Own Experience
Operational 6608/1-1 S N/A 12/09/2022 Captain of the vessel suggested to use the Brine tank for the Premix as Premix does not contain . . .

Johan Kjos-Hanssen / Morten Laget



PDF


Edit