Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
2106 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Surface section 31/08/2021
Drilled 12 ¼” hole with Smith XZ616 AxeBlade PDC bit from 1613 m to 2895 m in a vertical hole. . . .

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2099 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Production section 29/08/2021
The NORM instrument was found finally found on the drillfloor, however in an unmarked black . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
2098 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Surface section 27/08/2021 Unable to set seal assembly after 13 3/8″ hanger was landed. Attempted several times to pressure up . . .

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2096 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Surface section 22/08/2021 DrilQuip MPT and BOP test tool was sent out without pup joints.

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2013 – DNO

Borgland Dolphin Drilling
Experience Transfer Meeting
Operational 2/5-15
Gomez
Top hole 14/08/2021 From among cementers it was decided to disconnect the dust collector before this job. The surge . . .

What does ETM mean?
Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2014 – DNO

Borgland Dolphin Drilling
Experience Transfer Meeting
Operational 2/5-15
Gomez
Surface section 14/08/2021 The Franks split bushing spider (SBS) did not fit inside the EMSCO rotary table on Borgland Dolphin.

Get in contact with Franks coordinator in town?
Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2015 – DNO

Borgland Dolphin Drilling
Experience Transfer Meeting
Operational 2/5-15
Gomez
Surface section 14/08/2021 All handling subs had 5 1/2″ size. Had to spend rig time and expose rig crew in red zone changing . . .

Contact all vendors that deliver tools with handling subs to Borgland Dolphin
Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2010 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Top hole 12/08/2021 We could not store enough Tuned Light cement on two cmt silos on the rig to get the required volume . . .

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2011 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Rig move 12/08/2021 Scope of work was not sent to OIM or DSV before job. Two men from Schlumberger arrived at rig to . . .

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2012 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Top hole 12/08/2021 ROV was only equipped with standard jetting tool with low flowrate, unable to remove larger amounts . . .

Drilling Supervisor / Morten Laget



PDF


Edit


DNO
1994 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H
Oselvar
P&A 21/07/2021 Bottom 0.5 m of the toolstring is the Ultrasonic rotating IBCS-E sub. This sub has a larger OD . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1990 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-3 HT2
Oselvar
P&A 13/07/2021 Set 20″ EZSV at 694,5 m according to procedure. Tagged EZSV with 10 t. Pressured up to 50 bar, no . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1970 – DNO

Borgland Dolphin Drilling Operational A-3 HT2
Oselvar
P&A 05/07/2021 The 9 5/8″ casing hanger had a 10″ pup joint made up to it This was not identified on the hanger . . .

Drilling Engineer / Stig Seland



PDF


Edit


DNO
1969 – DNO

Borgland Dolphin Drilling Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 01/07/2021
Drill crew observed that Slips for perforating guns came out
to rig without handles.

Øystein Prytz / Stig Seland



PDF


Edit


DNO
1968 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 30/06/2021 Initially believed that we did not get a good pressure test (Formation Integrity Test). Suspected . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1930 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 29/06/2021 We had a lot of friction in a long and deviated well A3 with brine.

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1547 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 29/05/2021 Camera not able to get a 360 view as it was off center

Lars Solvang / Stig Seland



PDF


Edit


DNO
1546 – DNO

Borgland Dolphin Multi Discipline
Own Experience
INTERNAL
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 27/05/2021 Unstable and sometimes no connection at all. Poor sound quality during meetings with the rig.

Øystein Prytz / Stig Seland



PDF


Edit


DNO
1466 – DNO

Borgland Dolphin Well test
Experience Transfer Meeting
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 09/05/2021
The distance between the Archer pump to grease head is 40+ meters, with the hose full of grease it . . .

Drilling Engineer / Stig Seland



PDF


Edit


DNO
1446 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-3 HT2
Oselvar
P&A 26/04/2021 A week’s work trying to pull completion, high overpulls throughout, over 200 plastic clamps lost . . .

Drilling Supervisor / Stig Seland



PDF


Edit