Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
6762 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 Conductor sent out with metal protectors.

Lene Lomeland


PDF


Edit


DNO
6763 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 The hammer and drive sleeve were made up on the rig by Expro crew. The hammer and drive sleeve were . . .

Lene Lomeland


PDF


Edit


DNO
6764 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 Due to lack of availability of the S200 hammer an S280 was used. During the majority of the driving . . .

Lene Lomeland


PDF


Edit


DNO
6765 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 After 2 ½ joints was driven in ground the rebound was observed to be very high, Blowcount was also . . .

Lene Lomeland


PDF


Edit


DNO
6766 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 Both TFMC and Mitsui numbers marked on joints. TFMC rig numbers marked but with prefix TFMC making . . .

Lene Lomeland


PDF


Edit


DNO
6767 – DNO

Nobel Invincible Logistics Planning 2/6-7 S
Falstaff
Top hole 23/09/2024 Excellent planning. Safely executed. Experienced and knowledgeable Expro crews who cooperated good . . .

Lene Lomeland


PDF


Edit


DNO
6876 – DNO

Nobel Invincible HSEQ
NEA Q&A
Planning 2/6-7 S
Falstaff
N/A 02/05/2024

Fiskeridirektoratet fraråder at det blir gitt tillatelse til prøveboring. Som begrunnelse vises det . . .

Anniken Meisler / Anniken Meisler



PDF


Edit


DNO
6875 – DNO

Nobel Invincible HSEQ
NEA Q&A
Planning 2/6-7 S
Falstaff
N/A 09/04/2024

Planlagt hamring for lederør med lydutsending som starter på et lavt nivå og øker gradvis til . . .

Anniken Meisler / Anniken Meisler



PDF


Edit


DNO
5927 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
N/A 19/09/2023 Mud cooler was used frequently throughout the wells. It was mobilized during Eirik and rigged up . . .

John Langelandsvik / Morten Laget


PDF


Edit


DNO
5923 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Reservoir section 17/09/2023 While sampling the MDT Saturn probe got stuck. All attempts to free with wireline tension, cycling . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5924 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Reservoir section 17/09/2023 Side door overshot had to be run (provided by Archer with Archer-supplied procedures)

Drilling Engineer


PDF


Edit


DNO
5920 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
Reservoir section 11/09/2023 The cap rock was longer than anticipated, difference form mainbore. The core jammed off in the . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5921 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
Reservoir section 11/09/2023 Core jammed off on all 3 cores.

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5922 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
Reservoir section 11/09/2023 The BHA took weight on the way down in open hole. Had to ream down on several of the core runs. On . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5919 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
N/A 10/09/2023 Done as per plan. For the coring operations a new LCM pill was mixed. The LCM from the 8 1/2″ . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5912 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
N/A 06/09/2023 Plugging of transfer lines when taking Microbar from vessels several times.

John Langelandsvik / Morten Laget


PDF


Edit


DNO
5908 – DNO

Deepsea Yantai Operational 25/7-11 S
Norma
Reservoir section 05/09/2023 Wireline crew informed in the lesson learned meeting that it was some confusion on when to fire jar . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5909 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
P&A 05/09/2023 Due to high percentage of gas in the mud return the interface had to go over the shaker system and . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5910 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
Reservoir section 05/09/2023 High gas in return and losses. Believed to be due to ballooning effect. Once the well was flow . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5911 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
Reservoir section 05/09/2023 Time drill to initiate KO with 2 m/hr. Good performance kicking off from mainbore, no problems

Drilling Engineer / Morten Laget