Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
1396 – DNO

Borgland Dolphin Well test
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 05/04/2021 We discussed the option 1) of hanging the entire landings string with Wellsafe Explorer weak links, . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1397 – DNO

Borgland Dolphin Drilling Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 05/04/2021 The DOPs was in the best intention written very detailed, with exact description of many small . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1395 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 04/04/2021 Landing string got stuck after pulling 7 m. Possible stuck with SSTT at marine riser flex joint, OR . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1394 – DNO

Borgland Dolphin Logistics
Own Experience
INTERNAL
Operational A-3 HT2
Oselvar
Subsea work 03/04/2021 The POB got maxed out and there were no Covid-19 emergency cabins available at the time. Also, a . . .

Drilling Engineer / Stig Seland



PDF


Edit


DNO
1386 – DNO

Borgland Dolphin Logistics
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
Subsea 29/03/2021
During operations things got delayed and went missing in the transport route (Aker fuses for . . .

Drilling Engineer / Stig Seland



PDF


Edit


DNO
1376 – DNO

Borgland Dolphin Drilling
Own Experience
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 27/03/2021 A lot of changes in start of the operation. Change of document name, change of specific lines, . . .

Drilling Engineer / Stig Seland



PDF


Edit


DNO
1374 – DNO

Borgland Dolphin Drilling
Own Experience
INTERNAL
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
Other 19/03/2021
Extremely time-consuming compared to what we get in return. Render design (or just Pia . . .

Steinar Aarnes / Morten Laget


PDF


Edit


DNO
1361 – DNO

Borgland Dolphin Marine
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
Prelay 08/03/2021 By using 41deg fluke angles the anchors would not hold the required test tension

Stian Engvik / Morten Laget


PDF


Edit


DNO
1345 – DNO

Borgland Dolphin HSEQ
PSA Q&A
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 11/02/2021

Vernetjenesten i Dolphin Drilling har en kommentar i deres uttalelse til samtykket. Vi ber om . . .

Karina Helle / Morten Laget


PDF


Edit


DNO
1346 – DNO

Borgland Dolphin Subsurface
PSA Q&A
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
Reservoir section 11/02/2021

Det vil bli tatt prøver av gassbobler i forbindelse med marine operasjoner i forkant av oppstart . . .

Karina Helle / Morten Laget


PDF


Edit


DNO
1347 – DNO

Borgland Dolphin Marine
PSA Q&A
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 11/02/2021

På vårt spørsmål om andre radarantenner vil bidra i overvåkningen med Smartblue utover . . .

Karina Helle / Morten Laget


PDF


Edit


DNO
1348 – DNO

Borgland Dolphin Marine
PSA Q&A
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
Reservoir section 11/02/2021

Det er for øvrig ikke arkivert noe utdypende informasjon om Smartblue systemet hos oss, etter . . .

Karina Helle / Morten Laget


PDF


Edit


DNO
1177 – DNO

Borgland Dolphin HSEQ Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 10/02/2021 Reactivation and emergency preparedness has been challenging

Karina Helle / Morten Laget



PDF


Edit


DNO
1238 – DNO

Borgland Dolphin HSEQ
NEA Q&A
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 09/02/2021

I kap 3.1 skriver dere at Etter fase 2 vil oljebasert borevæske (OBB) bli benyttet og brukt OBB vil . . .

Karina Helle / Morten Laget



PDF


Edit


DNO
1239 – DNO

Borgland Dolphin HSEQ
PSA Q&A
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 31/01/2021

«Hvordan har DNO påsett at reder har sikret at beredskapsrelatert utstyrt er blitt preservert, . . .

Karina Helle / Morten Laget



PDF


Edit


DNO
1240 – DNO

Borgland Dolphin Marine
PSA Q&A
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 31/01/2021

SmartBlue blir benyttet til trafikkovervåkning under operasjonen:
o I hvilken grad bidrar denne . . .

Karina Helle / Morten Laget



PDF


Edit


DNO
1241 – DNO

Borgland Dolphin Marine
PSA Q&A
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 31/01/2021

o Vil andre radarantenner bidra i overvåkningen med SmartBlue utover Borgland Dolphins egne?

Karina Helle / Morten Laget



PDF


Edit


DNO
1242 – DNO

Borgland Dolphin Marine
PSA Q&A
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 31/01/2021

o Responderer SmartBlue på objekter identifisert av radaren og/eller AIS-signal (f.eks. når TCPA . . .

Karina Helle / Morten Laget



PDF


Edit


DNO
1243 – DNO

Borgland Dolphin Marine
PSA Q&A
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 31/01/2021

o Vil SmartBlue være overlappende eller gi noe mer enn AIS og ARPA om bord på Borgland Dolphin (ref. . . .

Karina Helle / Morten Laget



PDF


Edit


DNO
1244 – DNO

Borgland Dolphin Drilling
PSA Q&A
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 31/01/2021

o Hva er back-up løsning ved manglende sement bak casing ?

Karina Helle / Morten Laget



PDF


Edit