WE Report

Lessons Learned

Lessons Learned865


Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

Wellesley
6455 – Wellesley

COSLPromoter Drilling
Own Experience
Operational 35/10-12 S
Gnomoria
P&A 05/07/2024 Observed flowback of the mud lost while running and cementing 9 5/8″ casing. Of ±200 m3 of mud lost, . . .

Drilling Engineer / Morten Laget



PDF


Edit


Wellesley
6391 – Wellesley

COSLPromoter Drilling
Own Experience
Planning 35/10-12AS
Gnomoria
Surface section 12/06/2024 Not possible to M/U the no-cross joint, because it was not possible to grip with the casing tong on . . .

Giacomo Bonomo / Morten Laget



PDF


Edit


Wellesley
6368 – Wellesley

COSLPromoter, COSL Promoter Drilling
Own Experience
Operational 35/11-5, 39/11-29S
Toppand East
Reservoir section 06/06/2024 The BOP test tool could not be used, because one of the TJ was in conflict with the LPR. The TJ . . .

Giacomo Bonomo / Morten Laget



PDF


Edit


Wellesley
5937 – Wellesley

Deepsea Yantai Drilling
Own Experience
INTERNAL
Operational 35/10-10S
Carmen
Other 24/10/2023 During operation several MoC’s were made. A link to the risk register was enclosed in the MoC . . .

Ã…se Kristin Pettersen


PDF


Edit


Wellesley
5936 – Wellesley

Deepsea Yantai Marine
Own Experience
Operational 35/10-10S
Carmen
CAN-Ductor 23/10/2023 Risk of WOW during Carmen CAN-Ductor installation and recovery leading to Wellesley being . . .

Stian Engvik / Morten Laget


PDF


Edit


Wellesley
5845 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
P&A 12/07/2023 Pulled casing hanger with upper annular closed and C&K lines closed.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5844 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10 A
Carmen
Production section 10/07/2023 Needed several trips with the tool up in the casing to cool it down.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5839 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Intermediate section 20/06/2023 The cement didn’t set up as expected.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5841 – Wellesley

Deepsea Yantai Drilling Planning 35/10-10S
Carmen
Intermediate section 20/06/2023 The CHSART was run with the pup sent out with the tool.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5843 – Wellesley

Deepsea Yantai Drilling Planning 35/10-10S
Carmen
Intermediate section 20/06/2023 It was separated into two runs. The cup tester did not fit in the 9 7/8″ wearbushing installed in . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5186 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Reservoir section 20/05/2023
Drilled 8 1/2″ section with 5 7/8″ DP with 1400-1500 lpm and low ROP, saw ECD up to 18 points.
MW . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5184 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Reservoir section 18/05/2023 Managed to fish roughly 1/2 of junk in hole that accumulated in junk basket (some was seen over . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5185 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Reservoir section 18/05/2023 On second MDT got stuck with Saturn packer and had to release electrical cable head and fish . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5173 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Reservoir section 08/05/2023 Crew not participating in the pre-job meeting but involved in L/D core.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5172 – Wellesley

Deepsea Yantai Planning 35/10-10S
Carmen
Reservoir section 07/05/2023 Sent out a side door overshot from Archer last minute, but they did not have the grapples compatible . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5163 – Wellesley

Deepsea Yantai Drilling Planning 35/10-10S
Carmen
29/04/2023 There is to much information in the DOP’s. Easy to miss out on important steps because they are . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5157 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Production section 24/04/2023 It was done before the cementer got the change to da a pre-job check / install bypass baffle etc.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5158 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Reservoir section 24/04/2023
NPT: 7.75 hrs
Cost: 1 614 000 NOK

Cyber chair stopped functioning.
On Odfjell.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5159 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Production section 24/04/2023
Downtime due to reduced ROP after going to max ROP of 75 m/hr:
– Started with 30 m/hr
– Jumped up . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5160 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Production section 24/04/2023
Lube mud had 1.34 sg when taken up.
Needed to weight it down to ± 1.25 sg.
New lube mud for 12 . . .

Drilling Engineer / Morten Laget


PDF


Edit