Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
6761 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 Longer time than anticipated for grinding the weld on conductor.

Lene Lomeland


PDF


Edit


DNO
6762 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 Conductor sent out with metal protectors.

Lene Lomeland


PDF


Edit


DNO
6763 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 The hammer and drive sleeve were made up on the rig by Expro crew. The hammer and drive sleeve were . . .

Lene Lomeland


PDF


Edit


DNO
6764 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 Due to lack of availability of the S200 hammer an S280 was used. During the majority of the driving . . .

Lene Lomeland


PDF


Edit


DNO
6765 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 After 2 ½ joints was driven in ground the rebound was observed to be very high, Blowcount was also . . .

Lene Lomeland


PDF


Edit


DNO
6766 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 Both TFMC and Mitsui numbers marked on joints. TFMC rig numbers marked but with prefix TFMC making . . .

Lene Lomeland


PDF


Edit


DNO
6767 – DNO

Nobel Invincible Logistics Planning 2/6-7 S
Falstaff
Top hole 23/09/2024 Excellent planning. Safely executed. Experienced and knowledgeable Expro crews who cooperated good . . .

Lene Lomeland


PDF


Edit


DNO
5852 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 The pH meter showed indications of cement in return (pH value of 11.6-12.3). Due to poor visibility . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5853 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 After the cement of the 30″ conductor was set up the WHRT was released and POOH. Movement was seen . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5854 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 When checking for cement outside the condcutor there was no cement to be found on 3/4 of the sides. . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5855 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 After the 30″ conductor shoe was drilled the inclination of the conductor increased. Used the WHRT . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5856 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 Used the ROV dredging around the conductor after drilling the 9 7/8″ Pilot hole. The cleaning with . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5857 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 Due to problems with cement around the conductor and movement in conductor a clamp-on inclinometer . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5858 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 Due to problems with cement around the conductor and movement in conductor a Bullseye bracket from . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5859 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 Drawwork in landing mode. No change in hookload while cementing and displacing.

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5860 – DNO

Deepsea Yantai Drilling
Own Experience
Planning 25/7-11 S
Norma
Top hole 30/07/2023 One of the stop collars fell of when it was picked up from the boat. When laying down the . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5861 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 Difficult to see cement in return due to poor visibility at seabed. pH sniffer indicated cement in . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5862 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 When displacing the 26″ hole at TD a large volume of WBM was needed. And due to VDL the mud column . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5863 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 Everything went according to plan, no hole problems. Not much mud left.

Drilling Engineer / Morten Laget


PDF


Edit


DNO
2107 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Top hole 03/09/2021 Marker buoys too close to the hole, Fell inn and got drilled to bits. ROV use the marker buoys for . . .

Drilling Engineer / Morten Laget


PDF


Edit