WE Report

Lessons Learned

Lessons Learned865


Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

Wellesley
5135 – Wellesley

Deepsea Yantai Drilling Planning 35/10-10S
Carmen
Surface section 10/04/2023 Difficult to install

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5136 – Wellesley

Deepsea Yantai Drilling Planning 35/10-10S
Carmen
Surface section 10/04/2023 Overpull experienced trying to pull the WHRT clear of the Housing after release.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5137 – Wellesley

Deepsea Yantai Drilling Planning 35/10-10S
Carmen
Surface section 10/04/2023

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5121 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Surface section 09/04/2023 Did not observe a shoulder making the casing up to 27 500 ft-lbs.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5122 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Surface section 09/04/2023 The shoetrack was made up to 27,500 ft.lbs.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5123 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Surface section 09/04/2023 The centralizers was placed close to the bottom of the casing joint and was difficult to handle on . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
2413 – Wellesley

Borgland Dolphin Drilling
Own Experience
Operational 36/1-4
Hemispheres
Surface section 04/01/2022
Ahead of a connection at 1146m (105m below the 13 3/8″ shoe), a blockage occurred in the cuttings . . .

Drilling Supervisor / Morten Laget


PDF


Edit


Wellesley
483 – Wellesley

Borgland Dolphin Drilling Operational 6204/11-3
Schweinsteiger
Surface section 05/09/2020 Ran MPT tool dressed to pull extended wear bushing. Successfully engaged and sheared out but hung up . . .

Drilling Supervisor


PDF


Edit


Wellesley
233 – Wellesley

Transocean Arctic Drilling Operational 35/11-21 S
Grosbeak West
Surface section 16/06/2020 Several joints had to be broken out and made up again due to difficulties with centralizing joints . . .


PDF


Edit


Wellesley
253 – Wellesley

Transocean Arctic Drilling Operational 35/4-2
Songesand
Surface section 16/06/2020 The back-up 18 3/4″ wellhead assembly was sent out incomplete, without running tool, 9 m DP mandrel, . . .


PDF


Edit


Wellesley
254 – Wellesley

Transocean Arctic Drilling Operational 35/4-2
Songesand
Surface section 16/06/2020 Used 2 x pup joints due to aim of +-2 m rathole. The 2 m pup was difficult to make up due to the . . .


PDF


Edit


Wellesley
176 – Wellesley

Transocean Arctic Drilling Operational 35/12-7
Serin
Surface section 05/02/2019 5 MT WOB proved insufficient, no drilling progress in hard formation. Was allowed to increase to 10 . . .


PDF


Edit


Wellesley
177 – Wellesley

Transocean Arctic Drilling Operational 35/12-7
Serin
Surface section 05/02/2019 The 50-80 RPM range given in HSG was insufficient. There was a need to rotate bit & BHA faster . . .


PDF


Edit


Wellesley
178 – Wellesley

Transocean Arctic Drilling Operational 35/12-7
Serin
Surface section 05/02/2019 ECD calculation in SG EMW done by the MWD softwaremight not be intuitive. The SG is normally . . .


PDF


Edit


Wellesley
179 – Wellesley

Transocean Arctic Drilling Operational 35/12-7
Serin
Surface section 05/02/2019 The cuttings were encapsulated with mud, very little hydration, dry and crisp inside.


PDF


Edit


Wellesley
180 – Wellesley

Transocean Arctic Drilling Operational 35/12-7
Serin
Surface section 05/02/2019 Took time POOH from TD. Pulled straight to 15 MT overpull, worked same. Thereafter lubricated with . . .


PDF


Edit


Wellesley
181 – Wellesley

Transocean Arctic Drilling Operational 35/12-7
Serin
Surface section 05/02/2019 The 13 3/8″ casing was run to 2 m above the land off depth for 18 3/4″ WH. Circulated 1.5 x BU with . . .


PDF


Edit


Wellesley
182 – Wellesley

Transocean Arctic Drilling Operational 35/12-7
Serin
Surface section 05/02/2019 When pumping drillwater out of the cement unit displacement tank, the pump sucked air, and delivered . . .


PDF


Edit


Wellesley
194 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Surface section 05/02/2019 The stop ring for balloon centralizer on the inner string cmt stinger was installed on top of . . .


PDF


Edit


Wellesley
195 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Surface section 05/02/2019 The WHIM or “funnel” on the seabed for pumping mud up to the rig, filled up with gumbo and large . . .


PDF


Edit


New Lesson Learned