WE Report

Lessons Learned

Lessons Learned865


Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

PGNiG
4905 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
P&A 16/09/2022 To balanced the cement plug by pumping more spacer behind the cement plug.

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4901 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
P&A 14/09/2022 The heating cabinet in the logging unit does not work as required, not able to change the . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
3246 – Wellesley

Borgland Dolphin Drilling
Own Experience
Operational 36/1-4
Hemispheres
P&A 29/01/2022
Cement plug was pumped without incident, POOH through cement was without incident. Circulated clean . . .

Drilling Supervisor / Morten Laget



PDF


Edit


DNO
2209 – DNO

Borgland Dolphin External Environment
Own Experience
Planning 2/5-15
Gomez
P&A 06/10/2021 Due to potential WoW it was considered to leave the well and for DNO to join Oceaneering WH cutting . . .

Christina Sæland Rødne / Christina Sæland Rødne



PDF


Edit


DNO
2194 – DNO

Borgland Dolphin Wireline / Slickline
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 04/10/2021 Due to the missing clamps the control lines was coiled up around the tubing and made it impossible . . .

Lars Solvang / Stig Seland



PDF


Edit


DNO
2197 – DNO

Borgland Dolphin Wireline / Slickline
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 04/10/2021 Deep set plug failed during pressure test.

Lars Solvang / Stig Seland


PDF


Edit


DNO
2198 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 04/10/2021 H2S had formed in the annulus fluid.

Lars Solvang / Stig Seland



PDF


Edit


DNO
2199 – DNO

Borgland Dolphin Bleed of package
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 04/10/2021 Hydrocarbons contamination required a bleed off package to be installed.

Lars Solvang / Stig Seland



PDF


Edit


DNO
2200 – DNO

Borgland Dolphin Bleed of package
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 04/10/2021 The wireline plug failed and a backup had to be run.

Lars Solvang / Stig Seland



PDF


Edit


DNO
2201 – DNO

Borgland Dolphin Completion
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 04/10/2021 Clamps holding the control lines (polyoil clamps) had disintegrated.

Lars Solvang / Stig Seland



PDF


Edit


DNO
2202 – DNO

Borgland Dolphin Completion
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 04/10/2021 Clamps holding the control lines (polyoil clamps) had disintegrated. Tubing had to be cut after it . . .

Lars Solvang / Stig Seland



PDF


Edit


DNO
2203 – DNO

Borgland Dolphin Subsea
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 04/10/2021
The point load on the boat deck was higher than allowed and 4 x 1m2 steal plates was needed under . . .

Lars Solvang / Stig Seland



PDF


Edit


DNO
2172 – DNO

Borgland Dolphin Subsea
Own Experience
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 01/10/2021 As planned

Lars Solvang / Stig Seland



PDF


Edit


DNO
2173 – DNO

Borgland Dolphin Subsea
Own Experience
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 01/10/2021 Weight of the black eagle hose will make alignment to the manifold flushing cap difficult.

Lars Solvang / Stig Seland



PDF


Edit


DNO
2174 – DNO

Borgland Dolphin Subsea
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 01/10/2021 Extraction stopped as the hub was secured with wire bracing. These had to be cut before operation . . .

Lars Solvang / Stig Seland



PDF


Edit


DNO
2188 – DNO

Borgland Dolphin Subsea
Own Experience
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 01/10/2021 As planned

Lars Solvang / Stig Seland



PDF


Edit


DNO
2189 – DNO

Borgland Dolphin Subsea
Own Experience
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 01/10/2021 Two lubricator valves installed in the landing string.

Lars Solvang / Stig Seland



PDF


Edit


DNO
2190 – DNO

Borgland Dolphin Subsea
Own Experience
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 01/10/2021 As planned

Lars Solvang / Stig Seland



PDF


Edit


DNO
2191 – DNO

Borgland Dolphin Subsea
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 01/10/2021 Pulled landing string and run a tubing hanger running tool on drill pipe. Pull the completion with . . .

Lars Solvang / Stig Seland



PDF


Edit


DNO
2192 – DNO

Borgland Dolphin Wireline / Slickline
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 01/10/2021 Pulling HXT crown plugs with slickline using a mechanical jar was not successful. Changed out to a . . .

Lars Solvang / Stig Seland



PDF


Edit


New Lesson Learned

You do not have permission to view this form.




\n\t\t

\n\t\t\t\n\t\t\t