Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
1970 – DNO

Borgland Dolphin Drilling Operational A-3 HT2
Oselvar
P&A 05/07/2021 The 9 5/8″ casing hanger had a 10″ pup joint made up to it This was not identified on the hanger . . .

Drilling Engineer / Stig Seland



PDF


Edit


DNO
1969 – DNO

Borgland Dolphin Drilling Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 01/07/2021
Drill crew observed that Slips for perforating guns came out
to rig without handles.

Øystein Prytz / Stig Seland



PDF


Edit


DNO
1968 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 30/06/2021 Initially believed that we did not get a good pressure test (Formation Integrity Test). Suspected . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1930 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 29/06/2021 We had a lot of friction in a long and deviated well A3 with brine.

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1916 – DNO

Borgland Dolphin Logistics
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 23/06/2021 Cleaning of pulled XMT onshore at base. Major onshore handling operations.

Johan Kjos-Hanssen / Stig Seland



PDF


Edit


DNO
1554 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 03/06/2021 Overtorqued connection required cold cutting

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1546 – DNO

Borgland Dolphin Multi Discipline
Own Experience
INTERNAL
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 27/05/2021 Unstable and sometimes no connection at all. Poor sound quality during meetings with the rig.

Øystein Prytz / Stig Seland



PDF


Edit


DNO
1466 – DNO

Borgland Dolphin Well test
Experience Transfer Meeting
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 09/05/2021
The distance between the Archer pump to grease head is 40+ meters, with the hose full of grease it . . .

Drilling Engineer / Stig Seland



PDF


Edit


DNO
1456 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-3 HT2
Oselvar
P&A 03/05/2021 Both sides of the UHG can be used on the TRT but the port side of the UHG comes into conflict with . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1457 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-3 HT2
Oselvar
P&A 03/05/2021 Concerns were raised that with the HXT landed on the 105 ton skid as planned the bumper bars on the . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1446 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-3 HT2
Oselvar
P&A 26/04/2021 A week’s work trying to pull completion, high overpulls throughout, over 200 plastic clamps lost . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1425 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-3 HT2
Oselvar
P&A 20/04/2021
Total planned well volume was 150 m3 (tubing 50 m3, annulus 100 m3). After pumping 81 m3 the rig . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1426 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-3 HT2
Oselvar
P&A 20/04/2021
Evaluated rig-up and HXT valve and BOP status. Changed HXT valve status to the following: opened LPR . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1427 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-3 HT2
Oselvar
P&A 20/04/2021
Optimised process as follows:
Lined up rig BOP Lower Kill line to rig choke manifold and . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1428 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-3 HT2
Oselvar
P&A 20/04/2021
Ran tubing cutter in one assembly to avoid arming tool after assembling in sections.
Near perfect . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1429 – DNO

Borgland Dolphin Drilling Operational A-3 HT2
Oselvar
P&A 20/04/2021 Operations completed successfully, but forgot to flush lines from SFT to bleed-off package with . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1420 – DNO

Borgland Dolphin Subsea
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 15/04/2021 Unable to jar upper crown plug free. POOH and changed to hydraulic jar. Jarred upper crown plug free . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1419 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 11/04/2021 We pressure tested the BOP in an untraditional way using a BOP jump tool. This took very long time . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1415 – DNO

Borgland Dolphin Subsea
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 10/04/2021 Two fingers have been torn off the protective sleeve/ retainer ring on the SSTT. One finger was . . .

Sturla Jensen / Stig Seland



PDF


Edit


DNO
1416 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 10/04/2021 Had only 1 Dolphin sub sea engineer. He had to work overtime, and OIM had to make deviation. . . .

Drilling Supervisor / Stig Seland



PDF


Edit