WE Report

Lessons Learned

Lessons Learned865


Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

Wellesley
254 – Wellesley

Transocean Arctic Drilling Operational 35/4-2
Songesand
Surface section 16/06/2020 Used 2 x pup joints due to aim of +-2 m rathole. The 2 m pup was difficult to make up due to the . . .


PDF


Edit


Wellesley
255 – Wellesley

Transocean Arctic Drilling Operational 35/4-2
Songesand
Top hole 16/06/2020 The handling pup was 3 m which was not long enough to get the WH below rotary and get the tuggers up . . .


PDF


Edit


Wellesley
256 – Wellesley

Transocean Arctic Drilling Operational 35/4-2
Songesand
Production section 16/06/2020 The cement slurry for the 9 5/8″ casing was thick/sticky and caused cement pump suction problems . . .


PDF


Edit


Wellesley
257 – Wellesley

Transocean Arctic Drilling Operational 35/4-2
Songesand
Reservoir section 16/06/2020 Drilled 2 x wiper plugs and landing collar in 45 minutes using a milled tooth rock bit. 300 litres . . .


PDF


Edit


Wellesley
258 – Wellesley

Transocean Arctic Drilling Operational 35/4-2
Songesand
Reservoir section 16/06/2020 The mud engineer made a good displacement plan for displacing the well from SW to 1.25 sg mud. The . . .


PDF


Edit


Wellesley
259 – Wellesley

Transocean Arctic Drilling Operational 35/4-2
Songesand
Reservoir section 16/06/2020 The cold temperature in the riser and 300 m below seabed made the WBM more viscous than under normal . . .


PDF


Edit


Wellesley
260 – Wellesley

Transocean Arctic Drilling Operational 35/4-2
Songesand
Reservoir section 16/06/2020 Noticed several times that “slugs” of cuttings would reach the shakers for no good reason.


PDF


Edit


Wellesley
261 – Wellesley

Transocean Arctic Drilling Operational 35/4-2
Songesand
P&A 16/06/2020 After unlatching the BOP we forgot to remove the AX ring from the wellhead prior to pulling the BOP. . . .


PDF


Edit


Wellesley
262 – Wellesley

Transocean Arctic Drilling Operational 35/4-2
Songesand
P&A 16/06/2020 The Weatherford MOST tool was successfully used in rotary mode. The tool was dressed such that the . . .


PDF


Edit


Wellesley
263 – Wellesley

Transocean Arctic Drilling Operational 35/4-2
Songesand
P&A 16/06/2020 As on all previous wells, with the well displaced to seawater and wellhead cutting operations . . .


PDF


Edit


Wellesley
264 – Wellesley

Transocean Arctic Drilling Operational 35/4-2
Songesand
N/A 16/06/2020 Have been lucky all campaign not to have had any problems with the Halliburton OBM cuttings blower.


PDF


Edit


Wellesley
265 – Wellesley

Transocean Arctic Drilling Operational 25/1-13
Balcom
P&A 16/06/2020 Unable to run Weatherford 9 5/8″ casing cuting assembly past wellhead. Found out that spiral . . .


PDF


Edit


Wellesley
1201 – Wellesley

Borgland Dolphin Drilling
PSA Q&A
Planning 6204/11-3
Schweinsteiger
N/A 15/06/2020

Hvilke tiltak planlegges for å redusere risiko knyttet til de simulerte åpen hulls utblåsnings og . . .

Karina Helle / Morten Laget


PDF


Edit


Wellesley
1202 – Wellesley

Borgland Dolphin Drilling
PSA Q&A
Planning 6204/11-3
Schweinsteiger
N/A 15/06/2020

Vil 9 5/8» Casing pre-magnetiseres som nevnt som anbefaling i Blow-out & kill studien ? Ved . . .

Karina Helle / Morten Laget


PDF


Edit


Wellesley
1203 – Wellesley

Borgland Dolphin Drilling
PSA Q&A
Planning 6204/11-3
Schweinsteiger
N/A 15/06/2020

Hva er planlagt avstand fra den potensielt blåsende brønnen til spud lokasjon for de to . . .

Karina Helle / Morten Laget


PDF


Edit


Wellesley
206 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Production section 07/02/2019 Unable to release CRTi tool after using it for the first time (above). Spent 30 min. And called . . .


PDF


Edit


Wellesley
207 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Production section 07/02/2019 AxeBlade Bit performed well, did not create stick-slip.


PDF


Edit


Wellesley
208 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Production section 07/02/2019 The Halliburton BSS “skip & ship” system worked very well. There was no problem handling60 m/hr . . .


PDF


Edit


Wellesley
209 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Production section 07/02/2019


PDF


Edit


Wellesley
210 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Production section 07/02/2019 Problems experienced with poor quality of pre-doped connections. Remains of rusty water and storage . . .


PDF


Edit