Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
8481 – DNO

Deepsea Yantai Drilling Planning 35/10-13
Kjøttkake
Reservoir section 24/03/2025
Reached TD without signifigent problems. Sampled acc. To plan.
Some pressure point samples . . .

Sander Schaathun / Stig Seland


PDF


Edit


DNO
8482 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Reservoir section 24/03/2025 Very well executed and all objectives was met.

Sander Schaathun / Stig Seland


PDF


Edit


DNO
8325 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Reservoir section 19/02/2025 Due to upcoming bad weather we needed to set the plug using IO support.

Sander Schaathun / Stig Seland


PDF


Edit


DNO
6805 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Removed one slip element to allow passage of Frelok hydraulic line below RF without damage.

Lene Lomeland


PDF


Edit


DNO
6766 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 Both TFMC and Mitsui numbers marked on joints. TFMC rig numbers marked but with prefix TFMC making . . .

Lene Lomeland


PDF


Edit


DNO
6767 – DNO

Nobel Invincible Logistics Planning 2/6-7 S
Falstaff
Top hole 23/09/2024 Excellent planning. Safely executed. Experienced and knowledgeable Expro crews who cooperated good . . .

Lene Lomeland


PDF


Edit


DNO
5909 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
P&A 05/09/2023 Due to high percentage of gas in the mud return the interface had to go over the shaker system and . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5911 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
Reservoir section 05/09/2023 Time drill to initiate KO with 2 m/hr. Good performance kicking off from mainbore, no problems

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5906 – DNO

Deepsea Yantai Operational 25/7-11 S
Norma
Reservoir section 03/09/2023 The primary MDT tool and BU failed. A additional MDT tool was mobilized from Deepsea Stavanger.

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5872 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Surface section 07/08/2023 the ROP is very slow ( 1-2 m/hr) after drilling approximately 1500 meters using XZ816 PDC bit. . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5854 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 When checking for cement outside the condcutor there was no cement to be found on 3/4 of the sides. . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5855 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 After the 30″ conductor shoe was drilled the inclination of the conductor increased. Used the WHRT . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5859 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 Drawwork in landing mode. No change in hookload while cementing and displacing.

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5864 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
BOP running 30/07/2023 Used two ROVs to guide the BOP on top of WHH. No problems.

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5867 – DNO

Deepsea Yantai Subsurface
Own Experience
Operational 25/7-11 S
Norma
Surface section 30/07/2023 New version of the Gravitas earlier used. The WSG not used to the new version.

Drilling Engineer / Morten Laget


PDF


Edit


DNO
2094 – DNO

Borgland Dolphin Logistics
Own Experience
Operational 2/5-15
Gomez
Reservoir section 23/08/2021 Prior to mobilization of 8-1/2″ BHA, Coring and Wireline tools we held a aligmnement meeting to . . .

Johan Kjos-Hanssen


PDF


Edit


DNO
2006 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 02/08/2021 When pulling 13 3/8″ seal assembly on other wells the choke and kill line failsafes were open . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
2005 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 28/07/2021 Volume required was larger that expected for first 20 bar. However from 20 bar to 50 bar the volume . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
2004 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 27/07/2021
Franks tong was moved into the drill floor from the starboard tool landing are on the skate through . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1993 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H
Oselvar
P&A 19/07/2021 Jacked 9 5/8″ free using Baker Mastodon jacking tool. Used 49 pressure cycles to jack casing 17 m, . . .

Drilling Supervisor / Stig Seland



PDF


Edit