WE Report

Lessons Learned

Lessons Learned865


Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
2209 – DNO

Borgland Dolphin External Environment
Own Experience
Planning 2/5-15
Gomez
P&A 06/10/2021 Due to potential WoW it was considered to leave the well and for DNO to join Oceaneering WH cutting . . .

Christina Sæland Rødne / Christina Sæland Rødne



PDF


Edit


DNO
2196 – DNO

Borgland Dolphin Logistics 2/5-15
Gomez
04/10/2021 Backloaded with lack of information. Sent to wrong vendor/handled wrong. The casing was mistakenly . . .

Martin Vikse / Morten Laget


PDF


Edit


DNO
2130 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
P&A 19/09/2021 1 hr extra rig time was unnecessarily spent to make up x-over to the RT before it could be made up . . .

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2305 – DNO

Borgland Dolphin Logistics
Own Experience
Operational 2/5-15
Gomez
P&A 15/09/2021 Missing Protectors for 13-3/8″ Casing

Johan Kjos-Hanssen / Morten Laget



PDF


Edit


DNO
2108 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Intermediate section 05/09/2021
The PAB system failed before the cement job due to water ingress inside the unit which caused some . . .

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2107 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Top hole 03/09/2021 Marker buoys too close to the hole, Fell inn and got drilled to bits. ROV use the marker buoys for . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
2106 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Surface section 31/08/2021
Drilled 12 ¼” hole with Smith XZ616 AxeBlade PDC bit from 1613 m to 2895 m in a vertical hole. . . .

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2099 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Production section 29/08/2021
The NORM instrument was found finally found on the drillfloor, however in an unmarked black . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
2098 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Surface section 27/08/2021 Unable to set seal assembly after 13 3/8″ hanger was landed. Attempted several times to pressure up . . .

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2094 – DNO

Borgland Dolphin Logistics
Own Experience
Operational 2/5-15
Gomez
Reservoir section 23/08/2021 Prior to mobilization of 8-1/2″ BHA, Coring and Wireline tools we held a aligmnement meeting to . . .

Johan Kjos-Hanssen


PDF


Edit


DNO
2096 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Surface section 22/08/2021 DrilQuip MPT and BOP test tool was sent out without pup joints.

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2013 – DNO

Borgland Dolphin Drilling
Experience Transfer Meeting
Operational 2/5-15
Gomez
Top hole 14/08/2021 From among cementers it was decided to disconnect the dust collector before this job. The surge . . .

What does ETM mean?
Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2014 – DNO

Borgland Dolphin Drilling
Experience Transfer Meeting
Operational 2/5-15
Gomez
Surface section 14/08/2021 The Franks split bushing spider (SBS) did not fit inside the EMSCO rotary table on Borgland Dolphin.

Get in contact with Franks coordinator in town?
Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2015 – DNO

Borgland Dolphin Drilling
Experience Transfer Meeting
Operational 2/5-15
Gomez
Surface section 14/08/2021 All handling subs had 5 1/2″ size. Had to spend rig time and expose rig crew in red zone changing . . .

Contact all vendors that deliver tools with handling subs to Borgland Dolphin
Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2010 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Top hole 12/08/2021 We could not store enough Tuned Light cement on two cmt silos on the rig to get the required volume . . .

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2011 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Rig move 12/08/2021 Scope of work was not sent to OIM or DSV before job. Two men from Schlumberger arrived at rig to . . .

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2012 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Top hole 12/08/2021 ROV was only equipped with standard jetting tool with low flowrate, unable to remove larger amounts . . .

Drilling Supervisor / Morten Laget



PDF


Edit


DNO
1432 – DNO

Borgland Dolphin External Environment
NEA Q&A
Planning 2/5-15
Gomez
23/04/2021

Lack of justification why BO rates are lower in ST than MB, as the ST is 500 m deeper and length of . . .

Christina Sæland Rødne / Morten Laget



PDF


Edit


DNO
1433 – DNO

Borgland Dolphin External Environment
NEA Q&A
Planning 2/5-15
Gomez
23/04/2021

Change in regulation §66 – contingency chemicals does not include chemicals used for lost . . .

Christina Sæland Rødne / Christina Sæland Rødne



PDF


Edit


DNO
1434 – DNO

Borgland Dolphin External Environment
NEA Q&A
Planning 2/5-15
Gomez
23/04/2021

Subunit C in PL006C not available in Brønnøysundregisteret.

Christina Sæland Rødne / Christina Sæland Rødne


PDF


Edit


New Lesson Learned

You do not have permission to view this form.




\n\t\t

\n\t\t\t\n\t\t\t