WE Report

Lessons Learned

Lessons Learned865


Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

PGNiG
6747 – PGNiG

Deepsea Yantai Marine
Own Experience
Operational 6501/10-1
Tomcat
Pre-Lay 15/09/2024
We started on anchor 4. This anchor was together with anchor 5 and 6 supposed to be installed to . . .

Stian Engvik / Stig Seland


PDF


Edit


PGNiG
6223 – PGNiG

Deepsea Yantai HSEQ
Own Experience
Planning 6501/10-1
Tomcat
Other 08/05/2024
An evaluation of some changes was not documented.
A MOC process should cover any RELEVANT changes . . .

Ã…se Kristin Pettersen / Stig Seland


PDF


Edit


PGNiG
6874 – PGNiG

No Rig Other
Own Experience
Planning 6501/10-1
Tomcat
N/A 06/11/2023 It is strong currents at the location, and it was very hard to keep the ROV stable when surveying . . .

Anniken Meisler / Anniken Meisler



PDF


Edit


PGNiG
5834 – PGNiG

Deepsea Yantai Drilling
Own Experience
Planning 6305/10-1
Tomcat
N/A 15/06/2023
BO&K Analysis performed in Aug 2022, with a sensitivity on revised reservoir data.

The . . .

Richard Mollison / Morten Laget



PDF


Edit


PGNiG
4923 – PGNiG

Deepsea Yantai Logistics
Own Experience
Planning 6608/1-1 S
Copernicus
Other 03/10/2022 With this focus the mobilization plan became a live document and with a weekly focus, ensuring all . . .

Johan Kjos-Hanssen / Morten Laget



PDF


Edit


PGNiG
4914 – PGNiG

Deepsea Yantai HSEQ
Own Experience
INTERNAL
End of Well 6608/1-1 S
Copernicus
Other 26/09/2022 We didn’t ask of information from the DSV during the operation

Ã…se Kristin Pettersen / Morten Laget


PDF


Edit


PGNiG
4921 – PGNiG

Deepsea Yantai Logistics
Own Experience
Operational 6608/1-1 S
Copernicus
Other 20/09/2022 Due to late busy vessel schedule of PSV and MI Swaco vessel MS Norbar, mud for 8-1/2″ Section was . . .

Johan Kjos-Hanssen / Morten Laget



PDF


Edit


PGNiG
4922 – PGNiG

Deepsea Yantai Logistics
Own Experience
Operational 6608/1-1 S N/A 12/09/2022 Captain of the vessel suggested to use the Brine tank for the Premix as Premix does not contain . . .

Johan Kjos-Hanssen / Morten Laget



PDF


Edit


PGNiG
4842 – PGNiG

Deepsea Yantai Marine
Own Experience
Operational 6608/1-1 S
Copernicus
Rig move 09/09/2022 Marine reps identified possibility to start transit 2hrs before de-ballasting was completed. This . . .

Stian Engvik / Morten Laget


PDF


Edit


PGNiG
4843 – PGNiG

Deepsea Yantai Marine
Own Experience
Operational 6608/1-1 S
Copernicus
Rig move 09/09/2022 Bridge and marine reps was not informed from DSV or DE when required spud equipment was taken . . .

Stian Engvik / Morten Laget


PDF


Edit


PGNiG
4844 – PGNiG

Deepsea Yantai Marine
Own Experience
Operational 6608/1-1 S
Copernicus
Top hole 09/09/2022
Everything went according to plan and logging was done remotely. Final position report was delivered . . .

Stian Engvik / Morten Laget


PDF


Edit


PGNiG
4834 – PGNiG

Deepsea Yantai Drilling
Own Experience
Planning 6608/1-1 S
Copernicus
Other 04/09/2022 When running of 20″ x 13 3/8″ casing was planned to be on Sunday 4/9/22 we tried to get surge . . .

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4835 – PGNiG

Deepsea Yantai Drilling
Own Experience
Operational 6608/1-1 S
Copernicus
Surface section 04/09/2022
When the rig reached a TD of 1100 m and no contingency 4-string design was needed anymore, the 20″ . . .

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4840 – PGNiG

Deepsea Yantai Logistics
Own Experience
Operational 6608/1-1 S
Copernicus
Top hole 04/09/2022 With good planning and cooperation, everything shipped to SSJ prior to operation start in due time. . . .

Johan Kjos-Hanssen / Morten Laget



PDF


Edit


PGNiG
4841 – PGNiG

Deepsea Yantai Drilling
Own Experience
Operational 6608/1-1 S Intermediate section 04/09/2022 Had to switch to a BX elevator

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4830 – PGNiG

Deepsea Yantai Marine
Own Experience
Operational 6608/1-1 S
Copernicus
Rig move 29/08/2022 All tubulars were backloaded from the rig and mud and bulk tanks emptied. The rig was deballasted to . . .

Phil Hardy / Morten Laget


PDF


Edit


PGNiG
4947 – PGNiG

Deepsea Yantai HSEQ
Own Experience
Planning 6608/1-1 S
Copernicus
26/08/2022

/ Ã…se Kristin Pettersen



PDF


Edit


PGNiG
4763 – PGNiG

Deepsea Yantai Marine
Own Experience
Planning Copernicus Rig move 23/08/2022 Mooring analysis was requested at an early stage of the planning fase, but was not taken into . . .

Stian Engvik / Morten Laget


PDF


Edit


PGNiG
4764 – PGNiG

Deepsea Yantai HSEQ
Own Experience
Planning 6608/1-1 Other 23/08/2022 DSY waste management plan is according to IMO, and does not conflict with NOROG 093. It was . . .

Christina Sæland Rødne / Christina Sæland Rødne


PDF


Edit


PGNiG
4765 – PGNiG

Deepsea Yantai Drilling
Own Experience
Planning Copernicus Surface section 23/08/2022 The use of normal HWDP Requires double handling from fingerboard to well center when running and . . .

Richard Mollison / Morten Laget


PDF


Edit