Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
8481 – DNO

Deepsea Yantai Drilling Planning 35/10-13
Kjøttkake
Reservoir section 24/03/2025
Reached TD without signifigent problems. Sampled acc. To plan.
Some pressure point samples . . .

Sander Schaathun / Stig Seland


PDF


Edit


DNO
8482 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Reservoir section 24/03/2025 Very well executed and all objectives was met.

Sander Schaathun / Stig Seland


PDF


Edit


DNO
8323 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Reservoir section 19/02/2025 1” flowmeter hose burst causing spillage of OBM in the cement unit, while bleeding off during the . . .

Sander Schaathun / Stig Seland


PDF


Edit


DNO
8324 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Reservoir section 19/02/2025 MWD spent nightshift to program and confirm BHA. In the morning hours, it turns out that the plan . . .

Sander Schaathun / Stig Seland


PDF


Edit


DNO
8325 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Reservoir section 19/02/2025 Due to upcoming bad weather we needed to set the plug using IO support.

Sander Schaathun / Stig Seland


PDF


Edit


DNO
8326 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Reservoir section 19/02/2025 Needed to build a drilling pup for coring using a balldrop sub.

Sander Schaathun / Stig Seland


PDF


Edit


PGNiG
8283 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Reservoir section 15/02/2025 The BU float subs sent out for the operation had wrong/undesired OD. The BU float subs sent out was . . .

Drilling Engineer


PDF


Edit


PGNiG
8284 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Reservoir section 15/02/2025 No stethoscope run in the 8 ½” section.

Drilling Engineer


PDF


Edit


PGNiG
8286 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Reservoir section 15/02/2025 The weather forecasts are very unreliable, there are often discrepancies between the models. Which . . .

Drilling Engineer


PDF


Edit


PGNiG
8287 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Reservoir section 15/02/2025 The overshot initially was not sent out with the Ardyne fishing basket. The overshot was planned out . . .

Drilling Engineer


PDF


Edit


DNO
8264 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Reservoir section 14/02/2025 MWD spent nightshift to program and confirm BHA. In the morning hours, it turns out that the plan . . .

Drilling Engineer


PDF


Edit


DNO
6970 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Reservoir section 11/11/2024
When RIH with Whipstock/Milling BHA to set the Whipstock, it took weight in the 9 5/8” liner – not . . .

Lene Lomeland


PDF


Edit


DNO
6971 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Reservoir section 11/11/2024 The anchor for the first Whipstock did not set probably – did not grip onto the casing. When putting . . .

Lene Lomeland


PDF


Edit


Wellesley
6368 – Wellesley

COSLPromoter, COSL Promoter Drilling
Own Experience
Operational 35/11-5, 39/11-29S
Toppand East
Reservoir section 06/06/2024 The BOP test tool could not be used, because one of the TJ was in conflict with the LPR. The TJ . . .

Giacomo Bonomo / Morten Laget



PDF


Edit


Wellesley
6254 – Wellesley

COSLPromoter, COSL Promoter Drilling Operational 35/11-5, 39/11-29S
Toppand East
Reservoir section 30/05/2024 Needed to change the BX inserts. Resulting in 30 min rig time and unnecessary manual handling.

Drilling Engineer / Morten Laget



PDF


Edit


DNO
5923 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Reservoir section 17/09/2023 While sampling the MDT Saturn probe got stuck. All attempts to free with wireline tension, cycling . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5924 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Reservoir section 17/09/2023 Side door overshot had to be run (provided by Archer with Archer-supplied procedures)

Drilling Engineer


PDF


Edit


DNO
5920 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
Reservoir section 11/09/2023 The cap rock was longer than anticipated, difference form mainbore. The core jammed off in the . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5921 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
Reservoir section 11/09/2023 Core jammed off on all 3 cores.

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5922 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
Reservoir section 11/09/2023 The BHA took weight on the way down in open hole. Had to ream down on several of the core runs. On . . .

Drilling Engineer / Morten Laget