Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

Wellesley
6455 – Wellesley

COSLPromoter Drilling
Own Experience
Operational 35/10-12 S
Gnomoria
P&A 05/07/2024 Observed flowback of the mud lost while running and cementing 9 5/8″ casing. Of ±200 m3 of mud lost, . . .

Drilling Engineer / Morten Laget



PDF


Edit


Wellesley
6456 – Wellesley

COSLPromoter Drilling
Own Experience
Operational 35/10-12 S
Gnomoria
P&A 05/07/2024 Discussion about the risk of accidentally pulling the seal assembly free (no outer lock ring . . .

Drilling Engineer / Morten Laget



PDF


Edit


Wellesley
6391 – Wellesley

COSLPromoter Drilling
Own Experience
Planning 35/10-12AS
Gnomoria
Surface section 12/06/2024 Not possible to M/U the no-cross joint, because it was not possible to grip with the casing tong on . . .

Giacomo Bonomo / Morten Laget



PDF


Edit


Wellesley
6384 – Wellesley

COSLPromoter Drilling
Own Experience
Operational 35/10-4 A
Gnomoria
Top hole 11/06/2024 RMR external adapter in place. Not possible to easily access profile and install VX gasket without . . .

Giacomo Bonomo / Morten Laget



PDF


Edit


Wellesley
6368 – Wellesley

COSLPromoter, COSL Promoter Drilling
Own Experience
Operational 35/11-5, 39/11-29S
Toppand East
Reservoir section 06/06/2024 The BOP test tool could not be used, because one of the TJ was in conflict with the LPR. The TJ . . .

Giacomo Bonomo / Morten Laget



PDF


Edit


Wellesley
6369 – Wellesley

COSLPromoter, COSL Promoter Drilling
Own Experience
Operational 35/11-5, 39/11-29S
Toppand East
Surface section 06/06/2024 Not possible to reach the profile depth with the ROV jetting tool, as the RMR external adapter top . . .

Giacomo Bonomo / Morten Laget



PDF


Edit


Wellesley
6254 – Wellesley

COSLPromoter, COSL Promoter Drilling Operational 35/11-5, 39/11-29S
Toppand East
Reservoir section 30/05/2024 Needed to change the BX inserts. Resulting in 30 min rig time and unnecessary manual handling.

Drilling Engineer / Morten Laget



PDF


Edit


Wellesley
5937 – Wellesley

Deepsea Yantai Drilling
Own Experience
INTERNAL
Operational 35/10-10S
Carmen
Other 24/10/2023 During operation several MoC’s were made. A link to the risk register was enclosed in the MoC . . .

Ã…se Kristin Pettersen


PDF


Edit


Wellesley
5845 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
P&A 12/07/2023 Pulled casing hanger with upper annular closed and C&K lines closed.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5844 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10 A
Carmen
Production section 10/07/2023 Needed several trips with the tool up in the casing to cool it down.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5839 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Intermediate section 20/06/2023 The cement didn’t set up as expected.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5840 – Wellesley

Deepsea Yantai Drilling Planning 35/10-10S
Carmen
Intermediate section 20/06/2023 It was run according to tally.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5841 – Wellesley

Deepsea Yantai Drilling Planning 35/10-10S
Carmen
Intermediate section 20/06/2023 The CHSART was run with the pup sent out with the tool.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5842 – Wellesley

Deepsea Yantai Drilling Planning 35/10-10S
Carmen
Intermediate section 20/06/2023 Had some stringer in the bottom of the 12 1/4″ Section and had to work the csg hgr w/seal assy up . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5843 – Wellesley

Deepsea Yantai Drilling Planning 35/10-10S
Carmen
Intermediate section 20/06/2023 It was separated into two runs. The cup tester did not fit in the 9 7/8″ wearbushing installed in . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5835 – Wellesley

Deepsea Yantai Drilling
Own Experience
Planning 35/10-10S
Carmen
Surface section 16/06/2023 Crossovers supplied were of very different lengths: 4m, 6m and 12m.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5836 – Wellesley

Deepsea Yantai Drilling
Own Experience
Planning 35/10-10S
Carmen
Top hole 16/06/2023 The casing string run was a mixed string of VAM TOP and VAM 21 with VAP TOP run first. This meant . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5837 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Surface section 16/06/2023 Pups could not be run from aux using the “handshake” technique (too short for the Hydraracker) and . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5186 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Reservoir section 20/05/2023
Drilled 8 1/2″ section with 5 7/8″ DP with 1400-1500 lpm and low ROP, saw ECD up to 18 points.
MW . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5184 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Reservoir section 18/05/2023 Managed to fish roughly 1/2 of junk in hole that accumulated in junk basket (some was seen over . . .

Drilling Engineer / Morten Laget


PDF


Edit