Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

Wellesley
6384 – Wellesley

COSLPromoter Drilling
Own Experience
Operational 35/10-4 A
Gnomoria
Top hole 11/06/2024 RMR external adapter in place. Not possible to easily access profile and install VX gasket without . . .

Giacomo Bonomo / Morten Laget



PDF


Edit


Wellesley
6060 – Wellesley

Deepsea Yantai 35/10-10S
Carmen
Top hole 21/12/2023

Drilling Engineer


PDF


Edit


Wellesley
5836 – Wellesley

Deepsea Yantai Drilling
Own Experience
Planning 35/10-10S
Carmen
Top hole 16/06/2023 The casing string run was a mixed string of VAM TOP and VAM 21 with VAP TOP run first. This meant . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5125 – Wellesley

Deepsea Yantai Subsea Operational 35/10-10S
Carmen
Top hole 10/04/2023 When opening the trawl protector with the ROV, one of the locking pins fell off. It was recovered to . . .

Lene Lomeland / Morten Laget


PDF


Edit


Wellesley
5126 – Wellesley

Deepsea Yantai Operational 35/10-10S
Carmen
Top hole 10/04/2023 Ran mud mat from rig

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5113 – Wellesley

Deepsea Yantai Drilling Operational Eirik (OMV) Top hole 30/03/2023 Installation took about 0,5-0,75 hr rigtlme due to conductor movement and work above sea. . . .

Sander Schaathun / Morten Laget


PDF


Edit


Wellesley
2409 – Wellesley

Borgland Dolphin Drilling
Own Experience
Operational 36/1-4
Hemispheres
Top hole 01/01/2022 When making up 18 3/4″ WHH to No Cross joint it was very tight clearance for upper and lower jaws to . . .

Drilling Supervisor / Morten Laget


PDF


Edit


Wellesley
2347 – Wellesley

Borgland Dolphin Logistics
Own Experience
Operational 36/1-4
Hemispheres
Top hole 28/12/2021
Saga Fjordbase took the 75ft riser joint and backloaded in addition to the 30″ conductor joints. The . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
2326 – Wellesley

Borgland Dolphin Logistics
Own Experience
Operational 36/1-4
Hemispheres
Top hole 26/12/2021 The base and boat backloaded the primary and secondary 18 3/4″ WHHs instead of two 30″ conductor . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
2323 – Wellesley

Borgland Dolphin Drilling Operational 36/1-4
Hemispheres
Top hole 24/12/2021 Tool used successfully but Schlumberger should be told what our requirements are at the planning . . .

Drilling Supervisor / Morten Laget


PDF


Edit


Wellesley
2324 – Wellesley

Borgland Dolphin Drilling
Own Experience
Operational 36/1-4
Hemispheres
Top hole 24/12/2021
30″ conductor and cement was cleaned out with seawater and sweeps, hole displaced to 1.40 SG . . .

Drilling Supervisor / Morten Laget


PDF


Edit


Wellesley
2325 – Wellesley

Borgland Dolphin Drilling
Own Experience
Operational 36/1-4
Hemispheres
Top hole 24/12/2021
The deck-crew on days started to lay out slick joints in one bay before a crew change happened in . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
2321 – Wellesley

Borgland Dolphin Drilling
Own Experience
Operational 36/1-4
Hemispheres
Top hole 23/12/2021 o At 281m conductor couldn’t pass due to the tight spot observed when drilling there. Attempted to . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
2322 – Wellesley

Borgland Dolphin Logistics
Own Experience
Operational 36/1-4
Hemispheres
Top hole 23/12/2021
It was observed in the manifest that the connection on the 13 3/8″ swages was Vam21, in addition to . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
1358 – Wellesley

Borgland Dolphin Drilling
Own Experience
INTERNAL
Planning 36/1-4
Hemispheres
Top hole 04/03/2021 Multiple requests for data raised during the creation of the model. The data requests were often . . .

Giacomo Bonomo / Morten Laget


PDF


Edit


Wellesley
554 – Wellesley

Borgland Dolphin Drilling Operational 6204/11-3
Schweinsteiger
Top hole 21/09/2020
Not able to load barite due to long transfer lines when loading on starboard side.
Bentonite ended . . .

Drilling Supervisor


PDF


Edit


Wellesley
555 – Wellesley

Borgland Dolphin Drilling Operational 6204/11-3
Schweinsteiger
Top hole 21/09/2020 Took onboard 90 m3 ready mixed kill mud in Stolsfjorden

Drilling Supervisor


PDF


Edit


Wellesley
1063 – Wellesley

Borgland Dolphin Logistics Operational 6204/11-3
Schweinsteiger
Top hole 15/09/2020 Rig Required extra Barite at short notice due to challenges in top hole. PSV delivered Approximately . . .

Johan Kjos-Hanssen


PDF


Edit


Wellesley
481 – Wellesley

Borgland Dolphin Drilling Operational 6204/11-3
Schweinsteiger
Top hole 03/09/2020
Made up shoe track to maximum torque. On attempting to change torque values in JAM system to optimum . . .

Drilling Supervisor


PDF


Edit


Wellesley
476 – Wellesley

Borgland Dolphin Drilling Operational 6204/11-3
Schweinsteiger
Top hole 02/09/2020 Due to shallow gas zone at 331m, needed to fill casing with mud to be ready in case of need to wash . . .

Drilling Supervisor


PDF


Edit


New Lesson Learned

You do not have permission to view this form.