Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

Wellesley
177 – Wellesley

Transocean Arctic Drilling Operational 35/12-7
Serin
Surface section 05/02/2019 The 50-80 RPM range given in HSG was insufficient. There was a need to rotate bit & BHA faster . . .


PDF


Edit


Wellesley
178 – Wellesley

Transocean Arctic Drilling Operational 35/12-7
Serin
Surface section 05/02/2019 ECD calculation in SG EMW done by the MWD softwaremight not be intuitive. The SG is normally . . .


PDF


Edit


Wellesley
182 – Wellesley

Transocean Arctic Drilling Operational 35/12-7
Serin
Surface section 05/02/2019 When pumping drillwater out of the cement unit displacement tank, the pump sucked air, and delivered . . .


PDF


Edit


Wellesley
183 – Wellesley

Transocean Arctic Drilling Operational 35/12-7
Serin
Production section 05/02/2019 Drilled stab-in float collar in only 50 minutes, but used 3.5 hrs to drill shoe, which is more than . . .


PDF


Edit


Wellesley
184 – Wellesley

Transocean Arctic Drilling Operational 35/12-7
Serin
Production section 05/02/2019 Had to lay out several joints due to missing threads on top of pin ends, (9 5/8″, #53.3, P-110, . . .


PDF


Edit


Wellesley
185 – Wellesley

Transocean Arctic Logistics Operational 35/12-7
Serin
Reservoir section 05/02/2019 Stethoscope tool became primary means of taking pressure acquisition. Initial 14 pressure points . . .


PDF


Edit


Wellesley
186 – Wellesley

Transocean Arctic Drilling Operational 35/12-7
Serin
P&A 05/02/2019 Halliburton recommended to rotate the string while setting the P&A plugs, but did not supply a . . .


PDF


Edit


Wellesley
188 – Wellesley

Transocean Arctic Drilling Operational 35/12-7
Serin
P&A 05/02/2019 Paintjob was not successful. All paint washed off during job.


PDF


Edit


Wellesley
189 – Wellesley

Transocean Arctic Drilling Operational 35/12-7
Serin
P&A 05/02/2019 Observed 3 1/2″ cmt. Stinger partially plugged with debris and cement on POOH after having set 4 . . .


PDF


Edit


Wellesley
192 – Wellesley

Transocean Arctic Drilling Operational 35/12-7
Serin
P&A 05/02/2019 Believed that the HP housing lock ring was not set or only partially set, alternatively it was . . .


PDF


Edit


Wellesley
193 – Wellesley

Transocean Arctic Drilling Operational 35/12-7
Serin
P&A 05/02/2019 Equipment sent out did not include specialized eq for cut and pulling 30″ and 20″ casing in case the . . .


PDF


Edit


Wellesley
194 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Surface section 05/02/2019 The stop ring for balloon centralizer on the inner string cmt stinger was installed on top of . . .


PDF


Edit


Wellesley
195 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Surface section 05/02/2019 The WHIM or “funnel” on the seabed for pumping mud up to the rig, filled up with gumbo and large . . .


PDF


Edit


Wellesley
196 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Surface section 05/02/2019 N/A


PDF


Edit


Wellesley
197 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Surface section 05/02/2019 A large volume (350 m3) bentonite mud was mixed before running casing for filling casing, emergency . . .


PDF


Edit


Wellesley
198 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Surface section 05/02/2019 Had trouble making up casing correctly due to movement of casing in slips. Had to back out several . . .


PDF


Edit


Wellesley
201 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Production section 05/02/2019 Tried to shear OBM mud in pits before drilling the 12 1/4″ section. At this time the well and all . . .


PDF


Edit


Wellesley
202 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
N/A 05/02/2019 Operating with 5 deck crew, as specified in the contract, does not allow for utilizing two deck . . .


PDF


Edit


Wellesley
203 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
N/A 05/02/2019 Column tank ST3 which was previously used for brine storage has within the last two years been . . .


PDF


Edit


Wellesley
204 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Production section 05/02/2019 Coating from 9 5/8″ casing blocked dices on Franks casing tong (upper jaws). Had to frequently clean . . .


PDF


Edit