Lessons Learned865


Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
2305 – DNO

Borgland Dolphin Logistics
Own Experience
Operational 2/5-15
Gomez
P&A 15/09/2021 Missing Protectors for 13-3/8″ Casing

Johan Kjos-Hanssen / Morten Laget



PDF


Edit


DNO
2110 – DNO

Borgland Dolphin Subsurface
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
Production section 08/09/2021 The results from the pressure test caused some initial confusion regarding if the test was . . .

Øystein Prytz / Stig Seland


PDF


Edit


DNO
2109 – DNO

Borgland Dolphin Project Management
Own Experience
Other A-1 H, A-2 H, A-3 HT2
Oselvar
Other 07/09/2021 Lead drilling engineer did not have admin rights on Oselvar Sharepoint.

Øystein Prytz / Stig Seland



PDF


Edit


DNO
2108 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Intermediate section 05/09/2021
The PAB system failed before the cement job due to water ingress inside the unit which caused some . . .

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2107 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Top hole 03/09/2021 Marker buoys too close to the hole, Fell inn and got drilled to bits. ROV use the marker buoys for . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
2106 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Surface section 31/08/2021
Drilled 12 ¼” hole with Smith XZ616 AxeBlade PDC bit from 1613 m to 2895 m in a vertical hole. . . .

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2099 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Production section 29/08/2021
The NORM instrument was found finally found on the drillfloor, however in an unmarked black . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
2098 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Surface section 27/08/2021 Unable to set seal assembly after 13 3/8″ hanger was landed. Attempted several times to pressure up . . .

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2093 – DNO

Borgland Dolphin Multi Discipline
Own Experience
INTERNAL
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 23/08/2021 No lessons learnt meetings were held with the offshore team (DSV and DE) during operations.

Øystein Prytz / Stig Seland



PDF


Edit


DNO
2094 – DNO

Borgland Dolphin Logistics
Own Experience
Operational 2/5-15
Gomez
Reservoir section 23/08/2021 Prior to mobilization of 8-1/2″ BHA, Coring and Wireline tools we held a aligmnement meeting to . . .

Johan Kjos-Hanssen


PDF


Edit


DNO
2096 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Surface section 22/08/2021 DrilQuip MPT and BOP test tool was sent out without pup joints.

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2010 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Top hole 12/08/2021 We could not store enough Tuned Light cement on two cmt silos on the rig to get the required volume . . .

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2011 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Rig move 12/08/2021 Scope of work was not sent to OIM or DSV before job. Two men from Schlumberger arrived at rig to . . .

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2012 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Top hole 12/08/2021 ROV was only equipped with standard jetting tool with low flowrate, unable to remove larger amounts . . .

Drilling Supervisor / Morten Laget



PDF


Edit


DNO
2006 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 02/08/2021 When pulling 13 3/8″ seal assembly on other wells the choke and kill line failsafes were open . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
2005 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 28/07/2021 Volume required was larger that expected for first 20 bar. However from 20 bar to 50 bar the volume . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
2004 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 27/07/2021
Franks tong was moved into the drill floor from the starboard tool landing are on the skate through . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1994 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H
Oselvar
P&A 21/07/2021 Bottom 0.5 m of the toolstring is the Ultrasonic rotating IBCS-E sub. This sub has a larger OD . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1993 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H
Oselvar
P&A 19/07/2021 Jacked 9 5/8″ free using Baker Mastodon jacking tool. Used 49 pressure cycles to jack casing 17 m, . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1992 – DNO

Borgland Dolphin C&P
Own Experience
INTERNAL
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 14/07/2021 Sometimes invoice dates does not match with actual backload dates

Drilling Engineer / Stig Seland



PDF


Edit