Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
6969 – DNO

Nobel Invincible Drilling Planning 2/6-7 S
Falstaff
P&A 11/11/2024 Attempted to dress off cement after the sample in the UCA cell started to build compressive . . .

Lene Lomeland


PDF


Edit


DNO
6970 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Reservoir section 11/11/2024
When RIH with Whipstock/Milling BHA to set the Whipstock, it took weight in the 9 5/8” liner – not . . .

Lene Lomeland


PDF


Edit


DNO
6960 – DNO

Deepsea Yantai External Environment
Own Experience
Other 25/7-11 S
Norma
Other 06/11/2024
Tilbakemelding fra NEA:
Vi registrerer at rapportert forbruk av diesel til kraftgenerering er . . .

Helene Folkvord / Anniken Meisler



PDF


Edit


DNO
6877 – DNO

Nobel Invincible External Environment
Own Experience
Planning 2/6-7 S
Falstaff
Other 10/10/2024 The PSV’s have crew change every 4 weeks meaning that at some point we are not able to meet this . . .

Helene Folkvord / Anniken Meisler



PDF


Edit


DNO
6801 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 After evaluating related risks of RIH with torque tool and stinger in one run – a decision was made . . .

Lene Lomeland


PDF


Edit


DNO
6802 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 The pre-torque was not conducted in town. Unable to fit it in the buckling machine in the workshop. . . .

Lene Lomeland


PDF


Edit


DNO
6806 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Used BX3 when FA-1 was observed to be incompatible with 20” casing.

Lene Lomeland


PDF


Edit


DNO
6809 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Difficulties to install the double drilling machine at scaffolding at diverter level for cutting the . . .

Lene Lomeland


PDF


Edit


DNO
6813 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Space out incorrect compared to Stack-up drawing from Well partner. The upper spool of the WH stack . . .

Lene Lomeland


PDF


Edit


DNO
6767 – DNO

Nobel Invincible Logistics Planning 2/6-7 S
Falstaff
Top hole 23/09/2024 Excellent planning. Safely executed. Experienced and knowledgeable Expro crews who cooperated good . . .

Lene Lomeland


PDF


Edit


DNO
6876 – DNO

Nobel Invincible HSEQ
NEA Q&A
Planning 2/6-7 S
Falstaff
N/A 02/05/2024

Fiskeridirektoratet fraråder at det blir gitt tillatelse til prøveboring. Som begrunnelse vises det . . .

Anniken Meisler / Anniken Meisler



PDF


Edit


DNO
6875 – DNO

Nobel Invincible HSEQ
NEA Q&A
Planning 2/6-7 S
Falstaff
N/A 09/04/2024

Planlagt hamring for lederør med lydutsending som starter på et lavt nivå og øker gradvis til . . .

Anniken Meisler / Anniken Meisler



PDF


Edit


DNO
5910 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
Reservoir section 05/09/2023 High gas in return and losses. Believed to be due to ballooning effect. Once the well was flow . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5907 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
P&A 03/09/2023 It was not clearly stated in the HLB cement program how the cement calculations should be carried . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5870 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
31/07/2023 Due to build up of cuttings around the wellhead after drilling pilot hole the marker buoys was . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5854 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 When checking for cement outside the condcutor there was no cement to be found on 3/4 of the sides. . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5856 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 Used the ROV dredging around the conductor after drilling the 9 7/8″ Pilot hole. The cleaning with . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5863 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 Everything went according to plan, no hole problems. Not much mud left.

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5865 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Surface section 30/07/2023 Problems in start of 17 1/2″ Section with plug in blower system to ISO tanks. Few skips in field.

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5111 – DNO

No Rig Marine
PSA Q&A
Planning No well Other 28/03/2023

Er bruk av PosmoorATA innenfor begrensingene gitt i appendiks til klassesertifikatet for Deepsea . . .

Karina Helle / Morten Laget



PDF


Edit