Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

PGNiG
8271 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Surface section 15/02/2025 The centralizer placement on the 20” interfered with the rollers on the casing tong.

Drilling Engineer


PDF


Edit


PGNiG
8272 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Surface section 15/02/2025 Not able to sting in CRTi to XO joint due to smaller ID.

Drilling Engineer


PDF


Edit


PGNiG
8273 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Surface section 15/02/2025 SMO stickup higher than what was communicated in DOP. Caused issues regarding visual confirmation of . . .

Drilling Engineer


PDF


Edit


PGNiG
8274 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Run Riser and BOP 15/02/2025 Slip joint seal not engaged during diverter test to check for leak.

Drilling Engineer


PDF


Edit


PGNiG
8277 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Intermediate section 15/02/2025 Losses and pack off during the circulation. Total losses in the end with 100 lpm.

Drilling Engineer


PDF


Edit


PGNiG
8281 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Production section 15/02/2025 Installed brackets on OWS tong after derailing during 13 3/8″ job.

Drilling Engineer


PDF


Edit


PGNiG
8267 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
9 7/8″ Pilot hole 14/02/2025 Very high ECD readings from MWD. Approaching FG. Suspected clay sticking to stab behind bit.

Drilling Engineer


PDF


Edit


PGNiG
8268 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Surface section 14/02/2025 MW keeps increasing, having to add a lot of premix. Ran short on premix and had to mix in water to . . .

Drilling Engineer


PDF


Edit


PGNiG
8269 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Surface section 14/02/2025 Tight spots which required up to 25 MT overpull to pull above.

Drilling Engineer


PDF


Edit


PGNiG
8270 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Surface section 14/02/2025 Due to bad weather and rig movement, it was evaluated and decided to install CRTi to be able to . . .

Drilling Engineer


PDF


Edit


PGNiG
4911 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
Surface section 20/09/2022
10-15 ton OP while pulling out of open hole.
Bit and stabs balled up / clay

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4906 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
Top hole 16/09/2022 30″ conductor was run as a “pre spud” activity. Hung off in landing string and acme sub in trip . . .

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4902 – PGNiG

Deepsea Yantai Logistics Operational 6608/1-1 S
Copernicus
Top hole 15/09/2022 It was sent out personell who had not been on the rig before and was not experienced with the . . .

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4903 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
Top hole 15/09/2022 Enhanced and ROV had to be on same channel as drillfloor when doing offline activity due to repeater . . .

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4904 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
Surface section 15/09/2022 The cement swivel was delivered with the wrong threads. Delivered with NC50, should been XT57.

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4949 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
Surface section 15/09/2022
After landing the 18 3/4″ LPWHH, the RT would not release from the WH. Several times they attempted . . .

Richard Mollison


PDF


Edit


PGNiG
4845 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
Production section 11/09/2022 Ran casing hanger through rotary and installed master bushing. Difficult to install due to short . . .

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4842 – PGNiG

Deepsea Yantai Marine
Own Experience
Operational 6608/1-1 S
Copernicus
Rig move 09/09/2022 Marine reps identified possibility to start transit 2hrs before de-ballasting was completed. This . . .

Stian Engvik / Morten Laget


PDF


Edit


PGNiG
4843 – PGNiG

Deepsea Yantai Marine
Own Experience
Operational 6608/1-1 S
Copernicus
Rig move 09/09/2022 Bridge and marine reps was not informed from DSV or DE when required spud equipment was taken . . .

Stian Engvik / Morten Laget


PDF


Edit


PGNiG
4844 – PGNiG

Deepsea Yantai Marine
Own Experience
Operational 6608/1-1 S
Copernicus
Top hole 09/09/2022
Everything went according to plan and logging was done remotely. Final position report was delivered . . .

Stian Engvik / Morten Laget