Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

PGNiG
4845 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
Production section 11/09/2022 Ran casing hanger through rotary and installed master bushing. Difficult to install due to short . . .

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4842 – PGNiG

Deepsea Yantai Marine
Own Experience
Operational 6608/1-1 S
Copernicus
Rig move 09/09/2022 Marine reps identified possibility to start transit 2hrs before de-ballasting was completed. This . . .

Stian Engvik / Morten Laget


PDF


Edit


PGNiG
4843 – PGNiG

Deepsea Yantai Marine
Own Experience
Operational 6608/1-1 S
Copernicus
Rig move 09/09/2022 Bridge and marine reps was not informed from DSV or DE when required spud equipment was taken . . .

Stian Engvik / Morten Laget


PDF


Edit


PGNiG
4844 – PGNiG

Deepsea Yantai Marine
Own Experience
Operational 6608/1-1 S
Copernicus
Top hole 09/09/2022
Everything went according to plan and logging was done remotely. Final position report was delivered . . .

Stian Engvik / Morten Laget


PDF


Edit


PGNiG
4830 – PGNiG

Deepsea Yantai Marine
Own Experience
Operational 6608/1-1 S
Copernicus
Rig move 29/08/2022 All tubulars were backloaded from the rig and mud and bulk tanks emptied. The rig was deballasted to . . .

Phil Hardy / Morten Laget


PDF


Edit


PGNiG
4831 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
29/08/2022 When the conductor was lowered to the seabed it was realised that a blanking plate from the Wellhead . . .

Phil Hardy / Morten Laget


PDF


Edit


Wellesley
2346 – Wellesley

Borgland Dolphin Logistics
Own Experience
Operational 36/1-4
Hemispheres
WELS/Kabal software 27/12/2021
Dolphin HR-personnel booked and moved people in WELS, then they confirmed them in WELS also, in . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
2324 – Wellesley

Borgland Dolphin Drilling
Own Experience
Operational 36/1-4
Hemispheres
Top hole 24/12/2021
30″ conductor and cement was cleaned out with seawater and sweeps, hole displaced to 1.40 SG . . .

Drilling Supervisor / Morten Laget


PDF


Edit


INEOS
2276 – INEOS

Borgland Dolphin Drilling
Own Experience
Operational 6306/3-1 S
Fat Canyon
Intermediate section 07/11/2021 Decided to use the Franks casing circulating tool FA-1

Drilling Supervisor / Morten Laget


PDF


Edit


INEOS
2280 – INEOS

Borgland Dolphin Drilling
Own Experience
Operational 6306/3-1 S
Fat Canyon
Intermediate section 07/11/2021 Had initially many problems with Franks equipment that did not work, and cold windy weather outside . . .

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2198 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 04/10/2021 H2S had formed in the annulus fluid.

Lars Solvang / Stig Seland



PDF


Edit


DNO
2200 – DNO

Borgland Dolphin Bleed of package
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 04/10/2021 The wireline plug failed and a backup had to be run.

Lars Solvang / Stig Seland



PDF


Edit


DNO
2202 – DNO

Borgland Dolphin Completion
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 04/10/2021 Clamps holding the control lines (polyoil clamps) had disintegrated. Tubing had to be cut after it . . .

Lars Solvang / Stig Seland



PDF


Edit


DNO
2174 – DNO

Borgland Dolphin Subsea
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 01/10/2021 Extraction stopped as the hub was secured with wire bracing. These had to be cut before operation . . .

Lars Solvang / Stig Seland



PDF


Edit


DNO
2110 – DNO

Borgland Dolphin Subsurface
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
Production section 08/09/2021 The results from the pressure test caused some initial confusion regarding if the test was . . .

Øystein Prytz / Stig Seland


PDF


Edit


DNO
2098 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Surface section 27/08/2021 Unable to set seal assembly after 13 3/8″ hanger was landed. Attempted several times to pressure up . . .

Drilling Supervisor / Morten Laget


PDF


Edit


DNO
2093 – DNO

Borgland Dolphin Multi Discipline
Own Experience
INTERNAL
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 23/08/2021 No lessons learnt meetings were held with the offshore team (DSV and DE) during operations.

Øystein Prytz / Stig Seland



PDF


Edit


DNO
2012 – DNO

Borgland Dolphin Drilling
Own Experience
Operational 2/5-15
Gomez
Top hole 12/08/2021 ROV was only equipped with standard jetting tool with low flowrate, unable to remove larger amounts . . .

Drilling Supervisor / Morten Laget



PDF


Edit


DNO
2005 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 28/07/2021 Volume required was larger that expected for first 20 bar. However from 20 bar to 50 bar the volume . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1994 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H
Oselvar
P&A 21/07/2021 Bottom 0.5 m of the toolstring is the Ultrasonic rotating IBCS-E sub. This sub has a larger OD . . .

Drilling Supervisor / Stig Seland



PDF


Edit


New Lesson Learned

You do not have permission to view this form.




\n\t\t

\n\t\t\t\n\t\t\t