Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

Wellesley
6368 – Wellesley

COSLPromoter, COSL Promoter Drilling
Own Experience
Operational 35/11-5, 39/11-29S
Toppand East
Reservoir section 06/06/2024 The BOP test tool could not be used, because one of the TJ was in conflict with the LPR. The TJ . . .

Giacomo Bonomo / Morten Laget



PDF


Edit


Wellesley
6254 – Wellesley

COSLPromoter, COSL Promoter Drilling Operational 35/11-5, 39/11-29S
Toppand East
Reservoir section 30/05/2024 Needed to change the BX inserts. Resulting in 30 min rig time and unnecessary manual handling.

Drilling Engineer / Morten Laget



PDF


Edit


Wellesley
5186 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Reservoir section 20/05/2023
Drilled 8 1/2″ section with 5 7/8″ DP with 1400-1500 lpm and low ROP, saw ECD up to 18 points.
MW . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5184 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Reservoir section 18/05/2023 Managed to fish roughly 1/2 of junk in hole that accumulated in junk basket (some was seen over . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5185 – Wellesley

Deepsea Yantai Drilling
Own Experience
Operational 35/10-10S
Carmen
Reservoir section 18/05/2023 On second MDT got stuck with Saturn packer and had to release electrical cable head and fish . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5173 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Reservoir section 08/05/2023 Crew not participating in the pre-job meeting but involved in L/D core.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5174 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Reservoir section 08/05/2023 Treated the mud for the second and subsequent runs circulating BU after cutting cores.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5175 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Reservoir section 08/05/2023 Followed the HPHT manual for fingerprinting. Fingerprinter found some improvement point to the . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5176 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Reservoir section 08/05/2023 When coring 54 m cores, during connection the kick stand was removed a single joint was connected . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5172 – Wellesley

Deepsea Yantai Planning 35/10-10S
Carmen
Reservoir section 07/05/2023 Sent out a side door overshot from Archer last minute, but they did not have the grapples compatible . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5162 – Wellesley

Deepsea Yantai Drilling Planning 35/10-10S
Carmen
Reservoir section 29/04/2023 Found some deviation in the DOP’s from the HPHT manual.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5161 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Reservoir section 26/04/2023 Weighted up the mud by mixing in a heavier mud. The volume of heavier mud can partially compensate . . .

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5158 – Wellesley

Deepsea Yantai Drilling Operational 35/10-10S
Carmen
Reservoir section 24/04/2023
NPT: 7.75 hrs
Cost: 1 614 000 NOK

Cyber chair stopped functioning.
On Odfjell.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley
5116 – Wellesley

Deepsea Yantai Drilling Operational Eirik (OMV) Reservoir section 30/03/2023
Change of slips due to damage of pump in sub connection.
Due to the low ROP the pump in sub side . . .

Sander Schaathun / Morten Laget


PDF


Edit


Wellesley
5112 – Wellesley

Deepsea Yantai Drilling Operational Eirik (OMV) Reservoir section 29/03/2023 Did not provide desired slug effect.

Sander Schaathun / Morten Laget


PDF


Edit


Wellesley
235 – Wellesley

Transocean Arctic Drilling Operational 35/11-21 S
Grosbeak West
Reservoir section 16/06/2020 Dropped 2 15/16″ drift to check 5 1/2″ DP/HWDP prior to coring (coring ball 1 1/4″). The drift was . . .


PDF


Edit


Wellesley
236 – Wellesley

Transocean Arctic Drilling Operational 35/11-21 S
Grosbeak West
Reservoir section 16/06/2020 720 litres of crude oil was left in bottom of well after MDT sampling on wireline. The MDT run was 2 . . .


PDF


Edit


Wellesley
237 – Wellesley

Transocean Arctic Well test Operational 35/11-21 S
Grosbeak West
Reservoir section 16/06/2020 Had to break and re-M/U several joints on Vallourec 7″ 32# P-110 Vam 21 liner due to coating on 7″ . . .


PDF


Edit


Wellesley
238 – Wellesley

Transocean Arctic Well test Operational 35/11-21 S
Grosbeak West
Reservoir section 16/06/2020 It took a lot of force to stab 2 x wiper plugs and 2 x cup testers into the 7″ liner. These items . . .


PDF


Edit


Wellesley
239 – Wellesley

Transocean Arctic Well test Operational 35/11-21 S
Grosbeak West
Reservoir section 16/06/2020 Only able to pump with 2500 lpm while cleaning up 9 5/8″ casing and displacing from OBM to brine.


PDF


Edit


New Lesson Learned