Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

Wellesley
198 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Surface section 05/02/2019 Had trouble making up casing correctly due to movement of casing in slips. Had to back out several . . .


PDF


Edit


Wellesley
199 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Surface section 05/02/2019 The Franks CRTi tool was made up to top drive before csg entered OH. With the water depth and OH . . .


PDF


Edit


Wellesley
200 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Surface section 05/02/2019 Disadvantage of using MRR system: Drilling top hole with reactive clay formations using mud will . . .


PDF


Edit


Wellesley
201 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Production section 05/02/2019 Tried to shear OBM mud in pits before drilling the 12 1/4″ section. At this time the well and all . . .


PDF


Edit


Wellesley
202 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
N/A 05/02/2019 Operating with 5 deck crew, as specified in the contract, does not allow for utilizing two deck . . .


PDF


Edit


Wellesley
203 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
N/A 05/02/2019 Column tank ST3 which was previously used for brine storage has within the last two years been . . .


PDF


Edit


Wellesley
204 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Production section 05/02/2019 Coating from 9 5/8″ casing blocked dices on Franks casing tong (upper jaws). Had to frequently clean . . .


PDF


Edit


Wellesley
205 – Wellesley

Transocean Arctic Drilling Operational 35/12-6 S
Kallåsen
Production section 05/02/2019 Double float valves in shoe failed at around 900 m, still inside 13 3/8″ casing. Mud flowed back . . .


PDF


Edit


Wellesley
1138 – Wellesley

Transocean Arctic Marine
PSA Q&A
Planning 25/1-13
Balcom
N/A 04/12/2018

AFC Side 19. Hvilken hundreårsbølge er lagt til grunn for ankringsanalysene?

Karina Helle / Morten Laget


PDF


Edit


Wellesley
1140 – Wellesley

Transocean Arctic Marine
PSA Q&A
Planning 25/1-13
Balcom
N/A 04/12/2018

Vi ber om en beskrivelse av hvordan og til hvem et varsel fra Smart Blue-systemet blir formidlet . . .

Karina Helle / Morten Laget


PDF


Edit


Wellesley
1142 – Wellesley

Transocean Arctic Marine
PSA Q&A
Planning 25/1-13
Balcom
N/A 04/12/2018

Vi ber om en beskrivelse av hvilke alarmgivere som til enhver tid er tilkoblet Smart . . .

Karina Helle / Morten Laget


PDF


Edit


Wellesley
1130 – Wellesley

Transocean Arctic Marine
PSA Q&A
Planning 35/4-2
Songesand
N/A 11/10/2018

Etter søknadens punkt 2.2 er det mange pockmarks i området. Skal noen av ankerlinene ligge over dem, . . .

Karina Helle / Morten Laget


PDF


Edit


Wellesley
1132 – Wellesley

Transocean Arctic Marine
PSA Q&A
Planning 35/4-2
Songesand
N/A 11/10/2018

Slik vi leser punkt 6.4.3 om kollisjonsrisiko, skriver dere at sannsynligheten for å få kollisjoner . . .

Karina Helle / Morten Laget


PDF


Edit


Wellesley
1134 – Wellesley

Transocean Arctic HSEQ
PSA Q&A
Planning 35/4-2
Songesand
N/A 11/10/2018

Hvordan vil Wellesley påse at eventuelle utestående aksjoner innen arbeidsmiljø på Transocean Arctic . . .

Karina Helle / Morten Laget


PDF


Edit


Wellesley
1135 – Wellesley

Transocean Arctic Marine
PSA Q&A
Planning 35/4-2
Songesand
N/A 11/10/2018

Angående Smartblue-løsningen. Ber om en nærmere redegjørelse for valget opp mot døgnkontinuerlige . . .

Karina Helle / Morten Laget


PDF


Edit


Wellesley
1136 – Wellesley

Transocean Arctic HSEQ
PSA Q&A
Planning 35/4-2
Songesand
N/A 11/10/2018

Partnerinvolvering i forbindelse med risikovurdering av grunn gass og topp hulls borestrategi.

Karina Helle / Morten Laget


PDF


Edit


Wellesley
1125 – Wellesley

Transocean Arctic HSEQ
PSA Q&A
Planning 35/12-7
Serin
N/A 06/04/2018

I vedlegg 3, i uttalelse fra bedriftslege står det at det vil bli utført en ny helseverifikasjon i . . .

Karina Helle / Morten Laget


PDF


Edit


Wellesley
1126 – Wellesley

Transocean Arctic Drilling
PSA Q&A
Planning 35/12-7
Serin
N/A 06/04/2018

Blowout & Kill simulation report: Maximum oil blowout rate for the Serin well was found to . . .

Karina Helle / Morten Laget


PDF


Edit


Wellesley
1144 – Wellesley

Transocean Arctic HSEQ
PSA Q&A
Planning 35/12-6 S
Kallåsen
N/A 21/03/2018

I kap 6.9.1 vises det til at «Transocean Arctic verification and inspection plan for 2018» gir . . .

Karina Helle / Morten Laget


PDF


Edit


Wellesley
1145 – Wellesley

Transocean Arctic HSEQ
PSA Q&A
Planning 35/12-6 S
Kallåsen
N/A 21/03/2018

Hvordan vil Wellesley følge opp at aktiviteter og tiltak relatert til forebygging av helserisiko . . .