WE Report

Lessons Learned

Lessons Learned865


Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
1427 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-3 HT2
Oselvar
P&A 20/04/2021
Optimised process as follows:
Lined up rig BOP Lower Kill line to rig choke manifold and . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1428 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-3 HT2
Oselvar
P&A 20/04/2021
Ran tubing cutter in one assembly to avoid arming tool after assembling in sections.
Near perfect . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1429 – DNO

Borgland Dolphin Drilling Operational A-3 HT2
Oselvar
P&A 20/04/2021 Operations completed successfully, but forgot to flush lines from SFT to bleed-off package with . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1420 – DNO

Borgland Dolphin Subsea
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 15/04/2021 Unable to jar upper crown plug free. POOH and changed to hydraulic jar. Jarred upper crown plug free . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1419 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 11/04/2021 We pressure tested the BOP in an untraditional way using a BOP jump tool. This took very long time . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1415 – DNO

Borgland Dolphin Subsea
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 10/04/2021 Two fingers have been torn off the protective sleeve/ retainer ring on the SSTT. One finger was . . .

Sturla Jensen / Stig Seland



PDF


Edit


DNO
1416 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 10/04/2021 Had only 1 Dolphin sub sea engineer. He had to work overtime, and OIM had to make deviation. . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1417 – DNO

Borgland Dolphin Subsea
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 10/04/2021 Heavily bending on Lubricator Umbilical approx 1,5 m from termination head for. Caused by Clamp had . . .

Sturla Jensen / Stig Seland



PDF


Edit


DNO
1418 – DNO

Borgland Dolphin Subsea
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 10/04/2021
Disconnected BOP.
Inspected top of TH and crown plug.

Sturla Jensen / Stig Seland



PDF


Edit


DNO
1413 – DNO

Borgland Dolphin Drilling
Own Experience
INTERNAL
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 08/04/2021 Difficult to find the relevant risks in a very comprehensive risk register

Anniken Meisler / Anniken Meisler


PDF


Edit


DNO
1402 – DNO

Borgland Dolphin Subsea
Experience Transfer Meeting
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 07/04/2021 It was difficult to install and hold straight due to handle on the torque tool. It was also . . .

Sturla Jensen / Stig Seland



PDF


Edit


DNO
1400 – DNO

Borgland Dolphin Subsea
Own Experience
INTERNAL
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 06/04/2021 Unable to install flushing cap and URF offline, operations had to be done on rig time. Not able to . . .

Øystein Prytz / Stig Seland



PDF


Edit


DNO
1396 – DNO

Borgland Dolphin Well test
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 05/04/2021 We discussed the option 1) of hanging the entire landings string with Wellsafe Explorer weak links, . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1397 – DNO

Borgland Dolphin Drilling Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 05/04/2021 The DOPs was in the best intention written very detailed, with exact description of many small . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1395 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 04/04/2021 Landing string got stuck after pulling 7 m. Possible stuck with SSTT at marine riser flex joint, OR . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1394 – DNO

Borgland Dolphin Logistics
Own Experience
INTERNAL
Operational A-3 HT2
Oselvar
Subsea work 03/04/2021 The POB got maxed out and there were no Covid-19 emergency cabins available at the time. Also, a . . .

Drilling Engineer / Stig Seland



PDF


Edit


DNO
1386 – DNO

Borgland Dolphin Logistics
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
Subsea 29/03/2021
During operations things got delayed and went missing in the transport route (Aker fuses for . . .

Drilling Engineer / Stig Seland



PDF


Edit


Wellesley
1365 – Wellesley

Borgland Dolphin Marine
Own Experience
Operational 6204/11-3
Schweinsteiger
Rig move 09/03/2021 Two(2) harbour tugs were contracted by Dolphin Drilling to assist in holding Borgland Dolphin . . .

Stian Engvik / Morten Laget



PDF


Edit


DNO
1361 – DNO

Borgland Dolphin Marine
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
Prelay 08/03/2021 By using 41deg fluke angles the anchors would not hold the required test tension

Stian Engvik / Morten Laget


PDF


Edit


DNO
1062 – DNO

Island Innovator Logistics Operational 6507/7-16 S
Canela
05/02/2021 Several days with HK delay because of seastate 6 resitrictions and HTI warning. Afternoon Flight . . .

Johan Kjos-Hanssen



PDF


Edit


New Lesson Learned

You do not have permission to view this form.




\n\t\t

\n\t\t\t\n\t\t\t