Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

PGNiG
8265 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Top hole 14/02/2025 Suction problems during start of cement job. Problems with suction due to air in mixing system. . . .

Drilling Engineer


PDF


Edit


PGNiG
8266 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Surface section 14/02/2025 Had to run SMO on pipe due to too much heave.

Drilling Engineer


PDF


Edit


PGNiG
8267 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
9 7/8″ Pilot hole 14/02/2025 Very high ECD readings from MWD. Approaching FG. Suspected clay sticking to stab behind bit.

Drilling Engineer


PDF


Edit


PGNiG
8268 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Surface section 14/02/2025 MW keeps increasing, having to add a lot of premix. Ran short on premix and had to mix in water to . . .

Drilling Engineer


PDF


Edit


PGNiG
8269 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Surface section 14/02/2025 Tight spots which required up to 25 MT overpull to pull above.

Drilling Engineer


PDF


Edit


PGNiG
8270 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Surface section 14/02/2025 Due to bad weather and rig movement, it was evaluated and decided to install CRTi to be able to . . .

Drilling Engineer


PDF


Edit


PGNiG
8203 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Top hole 03/02/2025 NA

Drilling Engineer


PDF


Edit


PGNiG
8204 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Top hole 03/02/2025 Lost marker buoys out of basket when deploying.

Drilling Engineer


PDF


Edit


PGNiG
8205 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Top hole 03/02/2025 Protan AM sleeve came sliding down after making up connection on 36” WHH. Joint and conductor string . . .

Drilling Engineer


PDF


Edit


PGNiG
8206 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Top hole 03/02/2025 Fiberglass inner string broke off due to strong currents.

Drilling Engineer


PDF


Edit


PGNiG
6747 – PGNiG

Deepsea Yantai Marine
Own Experience
Operational 6501/10-1
Tomcat
Pre-Lay 15/09/2024
We started on anchor 4. This anchor was together with anchor 5 and 6 supposed to be installed to . . .

Stian Engvik / Stig Seland


PDF


Edit


PGNiG
4946 – PGNiG

Deepsea Yantai Drilling
Experience Transfer Meeting
Operational 6608/1-1 S
Copernicus
Production section 03/11/2022
The gas readings for the 12 ¼” was done very well, and the correlation was quite good between the . . .

Richard Mollison



PDF


Edit


PGNiG
4951 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1
Copernicus
N/A 26/09/2022 The Electrician was called and he found a loose wire (norwegian: fase) inside one of the . . .

Steinar Aarnes



PDF


Edit


PGNiG
4913 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
P&A 23/09/2022 When pulling the conductor there was no cement stuck to it due to use of protane wrapping on the . . .

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4911 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
Surface section 20/09/2022
10-15 ton OP while pulling out of open hole.
Bit and stabs balled up / clay

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4912 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
Production section 20/09/2022 Time was spend circulating hole clean and even MW in/out.

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4921 – PGNiG

Deepsea Yantai Logistics
Own Experience
Operational 6608/1-1 S
Copernicus
Other 20/09/2022 Due to late busy vessel schedule of PSV and MI Swaco vessel MS Norbar, mud for 8-1/2″ Section was . . .

Johan Kjos-Hanssen / Morten Laget



PDF


Edit


PGNiG
4908 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
19/09/2022 Spent 3 hours to release RT after landed 18 3/4″ WH

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4909 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
Top hole 19/09/2022 The SMO level sensor did not function in auto operation. Was operated manually. Enhanced made a . . .

Drilling Engineer / Morten Laget


PDF


Edit


PGNiG
4910 – PGNiG

Deepsea Yantai Drilling Operational 6608/1-1 S
Copernicus
P&A 19/09/2022 After setting 8 1/2″ OH P&A Cement Plug the plan was to circulate clean at 100 m over TOC and . . .

Drilling Engineer / Morten Laget