Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
8197 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Top hole 02/02/2025 Failed remote low torque valve on foam cement equipment, replaced pneumatic valve with manual item.

Stein-Petter Slatlem / Stig Seland


PDF


Edit


DNO
8198 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Top hole 02/02/2025 Did not work from drillers cabin, and had to use control panel from OWS. The panel were still in the . . .

Stein-Petter Slatlem / Stig Seland


PDF


Edit


DNO
8200 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Surface section 02/02/2025 Difficulties spinning in and M/U 7” Tubing.

Stein-Petter Slatlem / Stig Seland


PDF


Edit


DNO
6803 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Discovered dimensional issue between FA-1 tool and Dril-Quip couplings. Unable to enter with FA-1 . . .

Lene Lomeland


PDF


Edit


DNO
6804 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Lifting incident: when laying down the FA-1 tool came in contact with the Expro tong and damaged the . . .

Lene Lomeland


PDF


Edit


DNO
6807 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Used correct keys but Expro crew not fully familiar with how to install and remove – broke one key . . .

Lene Lomeland


PDF


Edit


DNO
6808 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 XT-22 tong was used – required machinery to be used in servie mode. This due to the tong did not fit . . .

Lene Lomeland


PDF


Edit


DNO
6811 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Handling gear was backloaded. Crew did not realize “long stub” would need to be laid out.

Lene Lomeland


PDF


Edit


DNO
6812 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Handling gear was backloaded. Crew did not realize “long stub” would need to be laid out.

Lene Lomeland


PDF


Edit


DNO
6757 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 Unable to get pressure reading on port fwd tension cylinder. Slacked off tension system and . . .

Lene Lomeland


PDF


Edit


Wellesley
6384 – Wellesley

COSLPromoter Drilling
Own Experience
Operational 35/10-4 A
Gnomoria
Top hole 11/06/2024 RMR external adapter in place. Not possible to easily access profile and install VX gasket without . . .

Giacomo Bonomo / Morten Laget



PDF


Edit


Wellesley
6368 – Wellesley

COSLPromoter, COSL Promoter Drilling
Own Experience
Operational 35/11-5, 39/11-29S
Toppand East
Reservoir section 06/06/2024 The BOP test tool could not be used, because one of the TJ was in conflict with the LPR. The TJ . . .

Giacomo Bonomo / Morten Laget



PDF


Edit


Wellesley Petroleum
6259 – Wellesley Petroleum

COSLPromoter, COSL Promoter Drilling Operational 35/11-5, 39/11-29S
Toppand East
Top hole 30/05/2024 The weight of the LPWHH was 15.4 ton w/o handling clamp and 17.2 tons with the handling clamp.

Drilling Engineer / Morten Laget


PDF


Edit


Wellesley Petroleum
6260 – Wellesley Petroleum

COSLPromoter, COSL Promoter Drilling Operational 35/11-5, 39/11-29S
Toppand East
Top hole 30/05/2024 Low resolution on the bullseye with 5 deg, compared to the 2 deg we had on top. Needed to use a . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5927 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
N/A 19/09/2023 Mud cooler was used frequently throughout the wells. It was mobilized during Eirik and rigged up . . .

John Langelandsvik / Morten Laget


PDF


Edit


DNO
5923 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Reservoir section 17/09/2023 While sampling the MDT Saturn probe got stuck. All attempts to free with wireline tension, cycling . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5924 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Reservoir section 17/09/2023 Side door overshot had to be run (provided by Archer with Archer-supplied procedures)

Drilling Engineer


PDF


Edit


DNO
5906 – DNO

Deepsea Yantai Operational 25/7-11 S
Norma
Reservoir section 03/09/2023 The primary MDT tool and BU failed. A additional MDT tool was mobilized from Deepsea Stavanger.

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5871 – DNO

Deepsea Yantai Planning 25/7-11 S
Norma
01/08/2023 Difficult to see with the ROV at seabed due to poor visibility and loose seabed conduction.

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5857 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Top hole 30/07/2023 Due to problems with cement around the conductor and movement in conductor a clamp-on inclinometer . . .

Drilling Engineer / Morten Laget


PDF


Edit