Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
6808 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 XT-22 tong was used – required machinery to be used in servie mode. This due to the tong did not fit . . .

Lene Lomeland


PDF


Edit


DNO
6809 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Difficulties to install the double drilling machine at scaffolding at diverter level for cutting the . . .

Lene Lomeland


PDF


Edit


DNO
6810 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Failure of Dril-quip lifting eyes while laying out the diverter from vertical to horizontal . . .

Lene Lomeland


PDF


Edit


DNO
6811 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Handling gear was backloaded. Crew did not realize “long stub” would need to be laid out.

Lene Lomeland


PDF


Edit


DNO
6812 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Handling gear was backloaded. Crew did not realize “long stub” would need to be laid out.

Lene Lomeland


PDF


Edit


DNO
6813 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Space out incorrect compared to Stack-up drawing from Well partner. The upper spool of the WH stack . . .

Lene Lomeland


PDF


Edit


DNO
6757 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 Unable to get pressure reading on port fwd tension cylinder. Slacked off tension system and . . .

Lene Lomeland


PDF


Edit


DNO
6758 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 Movement of conductor. Adjusted scaffold at diverter platform. Installed chain hoist horizontally in . . .

Lene Lomeland


PDF


Edit


DNO
6759 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 The flowrate during cleanout of conductor was limited to 2000 lpm due to overflow of bird bath. . . .

Lene Lomeland


PDF


Edit


DNO
6760 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 During cleanout of conductor was filled with fluid. When drilling the drain hole the fluid poured . . .

Lene Lomeland


PDF


Edit


DNO
6761 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 Longer time than anticipated for grinding the weld on conductor.

Lene Lomeland


PDF


Edit


DNO
6762 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 Conductor sent out with metal protectors.

Lene Lomeland


PDF


Edit


DNO
6763 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 The hammer and drive sleeve were made up on the rig by Expro crew. The hammer and drive sleeve were . . .

Lene Lomeland


PDF


Edit


DNO
6764 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 Due to lack of availability of the S200 hammer an S280 was used. During the majority of the driving . . .

Lene Lomeland


PDF


Edit


DNO
6765 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 After 2 ½ joints was driven in ground the rebound was observed to be very high, Blowcount was also . . .

Lene Lomeland


PDF


Edit


DNO
6766 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 23/09/2024 Both TFMC and Mitsui numbers marked on joints. TFMC rig numbers marked but with prefix TFMC making . . .

Lene Lomeland


PDF


Edit


DNO
5927 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
N/A 19/09/2023 Mud cooler was used frequently throughout the wells. It was mobilized during Eirik and rigged up . . .

John Langelandsvik / Morten Laget


PDF


Edit


DNO
5923 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Reservoir section 17/09/2023 While sampling the MDT Saturn probe got stuck. All attempts to free with wireline tension, cycling . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5924 – DNO

Deepsea Yantai Drilling
Own Experience
Operational 25/7-11 S
Norma
Reservoir section 17/09/2023 Side door overshot had to be run (provided by Archer with Archer-supplied procedures)

Drilling Engineer


PDF


Edit


DNO
5920 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
Reservoir section 11/09/2023 The cap rock was longer than anticipated, difference form mainbore. The core jammed off in the . . .

Drilling Engineer / Morten Laget


PDF


Edit