Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
8260 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Surface section 14/02/2025 Deep seat bucket takes a lot of rig time to install on drillfloor.

Drilling Engineer


PDF


Edit


DNO
8261 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Surface section 14/02/2025 Observed pressure increase during CMT operation.

Drilling Engineer


PDF


Edit


DNO
8262 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Surface section 14/02/2025
Deployed SMO on winch. ED’s recommendation is to run on DP. It was difficult to hold correct . . .

Drilling Engineer


PDF


Edit


DNO
8263 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Run BOP 14/02/2025 BOP had to be pulled just before landing due to grouting job necessary for conductor. Not able to . . .

Drilling Engineer


PDF


Edit


DNO
8264 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Reservoir section 14/02/2025 MWD spent nightshift to program and confirm BHA. In the morning hours, it turns out that the plan . . .

Drilling Engineer


PDF


Edit


PGNiG
8265 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Top hole 14/02/2025 Suction problems during start of cement job. Problems with suction due to air in mixing system. . . .

Drilling Engineer


PDF


Edit


PGNiG
8266 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Surface section 14/02/2025 Had to run SMO on pipe due to too much heave.

Drilling Engineer


PDF


Edit


PGNiG
8267 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
9 7/8″ Pilot hole 14/02/2025 Very high ECD readings from MWD. Approaching FG. Suspected clay sticking to stab behind bit.

Drilling Engineer


PDF


Edit


PGNiG
8268 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Surface section 14/02/2025 MW keeps increasing, having to add a lot of premix. Ran short on premix and had to mix in water to . . .

Drilling Engineer


PDF


Edit


PGNiG
8269 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Surface section 14/02/2025 Tight spots which required up to 25 MT overpull to pull above.

Drilling Engineer


PDF


Edit


PGNiG
8270 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Surface section 14/02/2025 Due to bad weather and rig movement, it was evaluated and decided to install CRTi to be able to . . .

Drilling Engineer


PDF


Edit


DNO
8207 – DNO

Deepsea Yantai Marine 35/10-13
Kjøttkake
08/02/2025 Monkey fist not attached to wellhead running tool prior to rigging up. Had to wait for ROV to make . . .

Drilling Engineer


PDF


Edit


DNO
8208 – DNO

Deepsea Yantai Drilling 35/10-13
Kjøttkake
08/02/2025 POOH and commenced drilling 26” hole section with RMR. After 20” casing was set and BOP ready to . . .

Drilling Engineer


PDF


Edit


PGNiG
8203 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Top hole 03/02/2025 NA

Drilling Engineer


PDF


Edit


PGNiG
8204 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Top hole 03/02/2025 Lost marker buoys out of basket when deploying.

Drilling Engineer


PDF


Edit


PGNiG
8205 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Top hole 03/02/2025 Protan AM sleeve came sliding down after making up connection on 36” WHH. Joint and conductor string . . .

Drilling Engineer


PDF


Edit


PGNiG
8206 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Top hole 03/02/2025 Fiberglass inner string broke off due to strong currents.

Drilling Engineer


PDF


Edit


DNO
8197 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Top hole 02/02/2025 Failed remote low torque valve on foam cement equipment, replaced pneumatic valve with manual item.

Stein-Petter Slatlem / Stig Seland


PDF


Edit


DNO
8198 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Top hole 02/02/2025 Did not work from drillers cabin, and had to use control panel from OWS. The panel were still in the . . .

Stein-Petter Slatlem / Stig Seland


PDF


Edit


DNO
8199 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Top hole 02/02/2025 Difficulties marking LPWHH as per DOP on deck prior to running same.

Stein-Petter Slatlem / Stig Seland