Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

PGNiG
8265 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Top hole 14/02/2025 Suction problems during start of cement job. Problems with suction due to air in mixing system. . . .

Drilling Engineer


PDF


Edit


PGNiG
8203 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Top hole 03/02/2025 NA

Drilling Engineer


PDF


Edit


PGNiG
8204 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Top hole 03/02/2025 Lost marker buoys out of basket when deploying.

Drilling Engineer


PDF


Edit


PGNiG
8205 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Top hole 03/02/2025 Protan AM sleeve came sliding down after making up connection on 36” WHH. Joint and conductor string . . .

Drilling Engineer


PDF


Edit


PGNiG
8206 – PGNiG

Deepsea Yantai Drilling Operational 6501/10-1
Tomcat
Top hole 03/02/2025 Fiberglass inner string broke off due to strong currents.

Drilling Engineer


PDF


Edit


DNO
8197 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Top hole 02/02/2025 Failed remote low torque valve on foam cement equipment, replaced pneumatic valve with manual item.

Stein-Petter Slatlem / Stig Seland


PDF


Edit


DNO
8198 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Top hole 02/02/2025 Did not work from drillers cabin, and had to use control panel from OWS. The panel were still in the . . .

Stein-Petter Slatlem / Stig Seland


PDF


Edit


DNO
8199 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
Top hole 02/02/2025 Difficulties marking LPWHH as per DOP on deck prior to running same.

Stein-Petter Slatlem / Stig Seland


PDF


Edit


DNO
6801 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 After evaluating related risks of RIH with torque tool and stinger in one run – a decision was made . . .

Lene Lomeland


PDF


Edit


DNO
6802 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 The pre-torque was not conducted in town. Unable to fit it in the buckling machine in the workshop. . . .

Lene Lomeland


PDF


Edit


DNO
6803 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Discovered dimensional issue between FA-1 tool and Dril-Quip couplings. Unable to enter with FA-1 . . .

Lene Lomeland


PDF


Edit


DNO
6804 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Lifting incident: when laying down the FA-1 tool came in contact with the Expro tong and damaged the . . .

Lene Lomeland


PDF


Edit


DNO
6805 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Removed one slip element to allow passage of Frelok hydraulic line below RF without damage.

Lene Lomeland


PDF


Edit


DNO
6806 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Used BX3 when FA-1 was observed to be incompatible with 20” casing.

Lene Lomeland


PDF


Edit


DNO
6807 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Used correct keys but Expro crew not fully familiar with how to install and remove – broke one key . . .

Lene Lomeland


PDF


Edit


DNO
6808 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 XT-22 tong was used – required machinery to be used in servie mode. This due to the tong did not fit . . .

Lene Lomeland


PDF


Edit


DNO
6809 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Difficulties to install the double drilling machine at scaffolding at diverter level for cutting the . . .

Lene Lomeland


PDF


Edit


DNO
6810 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Failure of Dril-quip lifting eyes while laying out the diverter from vertical to horizontal . . .

Lene Lomeland


PDF


Edit


DNO
6811 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Handling gear was backloaded. Crew did not realize “long stub” would need to be laid out.

Lene Lomeland


PDF


Edit


DNO
6812 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
Top hole 07/10/2024 Handling gear was backloaded. Crew did not realize “long stub” would need to be laid out.

Lene Lomeland


PDF