Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
8483 – DNO

Deepsea Yantai HSEQ Operational 35/10-13
Kjøttkake
P&A 24/03/2025 When cementer was dropping/pushing CST into DP filled with OBM “splashed” out of pipe and spilled on . . .

Sander Schaathun / Stig Seland


PDF


Edit


DNO
8484 – DNO

Deepsea Yantai Drilling Planning 35/10-13
Kjøttkake
P&A 24/03/2025 3 ½” DP was racked back in due time, but handling such small tubular takes time.

Sander Schaathun / Stig Seland


PDF


Edit


DNO
8380 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
P&A 04/03/2025 Indication of cut was not recognized. Decided to POOH and run in with B/U cutting eq. with marine . . .

Sander Schaathun / Stig Seland


PDF


Edit


DNO
8381 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
P&A 04/03/2025 When cutting the 9 5/8” casing with low flow / pressure, the parameters spiked / fluctiated. When . . .

Sander Schaathun / Stig Seland


PDF


Edit


DNO
8382 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
P&A 04/03/2025
Lost rubber drill pipe wiper downhole.
After pulled out with the cement stinger and when changing . . .

Sander Schaathun / Stig Seland


PDF


Edit


DNO
8383 – DNO

Deepsea Yantai Drilling Operational 35/10-13
Kjøttkake
P&A 04/03/2025 The swedge that arrived the rig had a XO. When setting a Kelly cock on the swedge the total length . . .

Sander Schaathun / Stig Seland


PDF


Edit


DNO
6978 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
P&A 21/11/2024 Sat the EZSV and tagged with 6t and and overpull of 27t. Performed two pressure tests, but both . . .

Drilling Engineer


PDF


Edit


DNO
6967 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
P&A 11/11/2024 For plug #1D incorrect concentration of retarder was used in the cement mix – extending the . . .

Lene Lomeland


PDF


Edit


DNO
6968 – DNO

Nobel Invincible Drilling Operational 2/6-7 S
Falstaff
P&A 11/11/2024 Due to incorrect concentration of retarder in #1D it was uncertainty of the density of the cement . . .

Lene Lomeland


PDF


Edit


DNO
6969 – DNO

Nobel Invincible Drilling Planning 2/6-7 S
Falstaff
P&A 11/11/2024 Attempted to dress off cement after the sample in the UCA cell started to build compressive . . .

Lene Lomeland


PDF


Edit


DNO
5909 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
P&A 05/09/2023 Due to high percentage of gas in the mud return the interface had to go over the shaker system and . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
5907 – DNO

Deepsea Yantai Drilling Operational 25/7-11 S
Norma
P&A 03/09/2023 It was not clearly stated in the HLB cement program how the cement calculations should be carried . . .

Drilling Engineer / Morten Laget


PDF


Edit


DNO
2209 – DNO

Borgland Dolphin External Environment
Own Experience
Planning 2/5-15
Gomez
P&A 06/10/2021 Due to potential WoW it was considered to leave the well and for DNO to join Oceaneering WH cutting . . .

Christina Sæland Rødne / Christina Sæland Rødne



PDF


Edit


DNO
2194 – DNO

Borgland Dolphin Wireline / Slickline
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 04/10/2021 Due to the missing clamps the control lines was coiled up around the tubing and made it impossible . . .

Lars Solvang / Stig Seland



PDF


Edit


DNO
2197 – DNO

Borgland Dolphin Wireline / Slickline
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 04/10/2021 Deep set plug failed during pressure test.

Lars Solvang / Stig Seland


PDF


Edit


DNO
2198 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 04/10/2021 H2S had formed in the annulus fluid.

Lars Solvang / Stig Seland



PDF


Edit


DNO
2199 – DNO

Borgland Dolphin Bleed of package
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 04/10/2021 Hydrocarbons contamination required a bleed off package to be installed.

Lars Solvang / Stig Seland



PDF


Edit


DNO
2200 – DNO

Borgland Dolphin Bleed of package
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 04/10/2021 The wireline plug failed and a backup had to be run.

Lars Solvang / Stig Seland



PDF


Edit


DNO
2201 – DNO

Borgland Dolphin Completion
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 04/10/2021 Clamps holding the control lines (polyoil clamps) had disintegrated.

Lars Solvang / Stig Seland



PDF


Edit


DNO
2202 – DNO

Borgland Dolphin Completion
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 04/10/2021 Clamps holding the control lines (polyoil clamps) had disintegrated. Tubing had to be cut after it . . .

Lars Solvang / Stig Seland



PDF


Edit